About the project

Preparation of an environmental permit application dossier for the Holsteenbron campsite in Zonhoven, including all unlicensed elements, to comply with a warning issued by the Department of Environment (Handhaving). The dossier will cover the entire campsite and ensure the municipality meets regulatory requirements on its own land.

Scope of work

Appointment of a study bureau to prepare a regularisation dossier for the Holsteenbron campsite, including environmental permit applications, architectural plans, environmental impact assessments (EIA/SEA), mobility studies, and compliance with nitrogen decree and rainwater regulations. The dossier must cover all unlicensed elements and ensure legal compliance for the municipality.

Deliverables

  • Environmental permit application dossier
  • Architectural plans for caretaker's residence and existing building extension
  • MER screening and nitrogen decree assessment
  • Mobility study and rainwater regulation compliance
  • Project-MER and appropriate assessment (if required)
  • Vegetation change application (if required)
  • Submission and follow-up of applications in the environmental office

Required services

  • Architectural planning
  • Environmental impact assessment
  • Permit application preparation and submission
  • Mobility and traffic studies
  • Regulatory compliance consulting

Pelenoir assessment

The Holsteenbron campsite regularisation dossier is primarily an architectural and regulatory compliance project, requiring the preparation of architectural plans for built elements alongside environmental and technical assessments. The scope explicitly supports multiple AEC disciplines, with architectural design as the dominant focus, complemented by engineering studies and specialist environmental consulting.

  • Preparation of architectural plans for the caretaker's residence and existing building extension, including site measurements, design adjustments, and compliance with regulatory requirements for the campsite's built elements.

  • Environmental impact assessments (MER screening, nitrogen decree assessment, project-MER), regulatory compliance consulting, and submission follow-up for the environmental permit application.

  • Technical assessments and engineering studies required for the environmental permit application, including rainwater regulation compliance, mobility studies, and infrastructure-related compliance checks.

How to take part

Who can apply

  • Architect title or collaboration with an architect
  • Minimum three and maximum five references of similar dossiers (multi-disciplinary, located in or near spatially vulnerable areas)
  • Compliance with exclusion grounds under Articles 67-69 of the Belgian Public Procurement Act (2016)
  • Professional qualifications of staff (to be specified)

What to submit

  • Detailed methodology and approach description
  • Client service and technical assistance plan
  • Execution timeline for permit submission
  • Pricing breakdown for all task elements (e.g., site visits, measurements, meetings, plan preparation)

Award criteria

  • Price (25% weight)
  • Proposed methodology and approach (25% weight)
  • Client service and technical assistance (25% weight)
  • Execution timelines (25% weight)

Source

Published on Belgian e-Procurement. Original title: Aanstellen studiebureau opmaak regularisatiedossier camping Holsteenbron.