About the project

Planning and design services for the renewal of Kossuth Street and streets in Révfalu district, including road reconstruction, traffic engineering, utility (water, wastewater, and lighting) design, and related infrastructure works. The project is divided into two lots: Lot 1 covers Kossuth Street, and Lot 2 covers streets in Révfalu.

Scope of work

Design and planning services for the renewal of two street sections in Győr: Kossuth Street (minimum 350m) and streets in Révfalu district (minimum 500m). Required services include preparation of approval and execution plans for road construction, traffic engineering, utility design (water, wastewater, and lighting), and compliance with Hungarian professional and regulatory standards.

Deliverables

  • Approval and execution plans for road reconstruction
  • Traffic engineering plans
  • Utility design (water, wastewater, and lighting)
  • Technical documentation for construction

Required services

  • Architectural and engineering planning services
  • Civil engineering design
  • Utility network design

Pelenoir assessment

This project primarily involves engineering and technical planning for street renewal, including road reconstruction, traffic engineering, and utility design. Secondary disciplines include urban design and planning for spatial integration, as well as surveying and geomatics to support technical documentation.

  • Structural, civil, and technical engineering for road reconstruction, traffic engineering, and utility network design (water, wastewater, and lighting) in Kossuth Street and Révfalu district.

  • Urban planning and coordination of street renewal to ensure integration with existing urban infrastructure and compliance with municipal standards.

  • Surveying 10%

    Surveying and geodata services to support the preparation of approval and execution plans for road reconstruction and utility design.

How to take part

Who can apply

  • Enrolment in the Hungarian Chamber of Engineers or equivalent professional register
  • Minimum 3 years of completed references in road reconstruction or renewal design, including utility and lighting design, within the last 6 years
  • At least one qualified traffic engineer (KÉ-K category or equivalent)
  • At least one qualified water utility engineer (VZ-TEL category or equivalent)
  • At least one qualified electrical engineer (EN-VI category or equivalent)

What to submit

  • Completed European Single Procurement Document (ESPD) with detailed information
  • Signed professional CVs of key personnel
  • Certificates of professional qualifications and experience
  • Statements of availability and commitment for key personnel

Award criteria

  • 1. Tender price - design fee (net HUF)
  • 2. Designer supervision fee (HUF/engineer-day)
  • 3. Additional experience of the traffic engineer (months beyond minimum requirement, max 24 months)
  • 4. Additional experience of the water utility engineer (months beyond minimum requirement, max 24 months)
  • 5. Additional experience of the electrical engineer (months beyond minimum requirement, max 24 months)

Tender documents

The visible document package includes two ZIP archives likely containing technical drawings and documentation for the Kossuth Street and Révfalui streets renewal projects. These archives are named '1 - Győr - Kossuth utca felújítás_műszaki dokumentumok.zip' and '2 - Győr - Révfalui utcák felújításának_műszaki dokumentumok.zip', suggesting they hold detailed engineering plans, surveys, or design files. The package also contains multiple PDFs, including draft contracts ('Szerződéstervezet'), design programs ('Tervezési program'), and procurement guidelines ('KD_I_kötet_Útmutató_mindkét részhez'). Additional documents include declaration templates ('Nyilatkozatminták') and supplementary information ('Kiegészítő tájékoztatás'). The exact contents of the ZIP files and some PDFs remain unknown as the files were not downloaded.

Source

Published on EKR. Original title: Győr útfelújítások tervezése Révfalu -Kossuth.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 3 Sep 2026.