About the project

Planning of rehabilitation measures for reinforced concrete components at the Griesheim hydropower plant, including the sluice passage, entrance area (lock platform), and weir walkway. The project includes preparing a rehabilitation concept according to ZTV-W/LB 219, executing service phases 1, 2, 3, 5, and 6 of HOAI object planning and phases 2, 3, 4, 5, and 6 of HOAI structural planning, as well as additional project-specific services such as concrete technology investigations.

Scope of work

Planning services for the rehabilitation of reinforced concrete components at the Griesheim hydropower plant, including a rehabilitation concept according to ZTV-W/LB 219, HOAI object planning (phases 1, 2, 3, 5, 6), HOAI structural planning (phases 2, 3, 4, 5, 6), and additional project-specific services such as concrete technology investigations.

Deliverables

  • Rehabilitation concept according to ZTV-W/LB 219
  • HOAI object planning (phases 1, 2, 3, 5, 6)
  • HOAI structural planning (phases 2, 3, 4, 5, 6)
  • Concrete technology investigations

Required services

  • object planning for civil engineering structures
  • structural planning for civil engineering structures
  • rehabilitation planning for hydropower plants

Pelenoir assessment

This project primarily involves engineering and technical planning for the rehabilitation of reinforced concrete components at a hydropower plant, with a secondary focus on project and construction management to oversee the planning phases and ensure compliance with technical standards.

  • Structural and object planning for the rehabilitation of reinforced concrete components at the Griesheim hydropower plant, including execution of HOAI phases 2-6 for structural planning and phases 1-3, 5-6 for object planning, as well as concrete technology investigations.

  • Coordination and management of the rehabilitation planning process, including client representation, cost and schedule oversight, and supervision of the planning phases as outlined in the tender.

How to take part

Who can apply

  • Three references from the last five years for rehabilitation measures in reinforced concrete engineering structures (object planning, HOAI phases 1, 2, 3, 5, 6), including honorarium zone
  • Three references from the last five years for rehabilitation measures in reinforced concrete engineering structures (structural planning, HOAI phases 2-6), including honorarium zone
  • List of available in-house personnel (project engineers, knowledgeable planners, structural engineers, and draftsmen) for the project

What to submit

  • Electronic submission without electronic signature (text form)

Award criteria

  • Quality and comparability of references (40% weight for object planning, 40% weight for structural planning)
  • Available in-house personnel (20% weight)
  • Additional criteria to be communicated to invited bidders