Engineering · Design and build
General Planner for Vienna Environmental Project MP16
Construction of new infrastructure for traffic, supply, and waste management as part of the Vienna Environmental Project MP16.
- Deadline
- Closed 50 days ago
- Location
- Vienna, Austria
About the project
Construction of new infrastructure for traffic, supply, and waste management as part of the Vienna Environmental Project MP16. The project involves a general planner contract for design and execution planning.
Scope of work
General planner contract for the design and execution of new traffic, supply, and waste management infrastructure. The contract includes planning, coordination, and realization of the project under the Bestbieterprinzip (best bidder principle), with a strong emphasis on price (95% weighting) over qualitative criteria (5% weighting).
Deliverables
- Design and execution plans for traffic, supply, and waste management infrastructure
- Coordination of construction and implementation phases
Required services
- General planning (Generalplanerauftrag)
- Design and execution planning
- Project coordination
Pelenoir assessment
This project is primarily focused on engineering and technical planning for the design and execution of traffic, supply, and waste management infrastructure. A secondary but significant component involves project and construction management for coordination and realization of the infrastructure.
-
Engineering 70%
Structural, civil, and technical engineering for traffic, supply, and waste management infrastructure, including design and execution planning.
-
Coordination of construction and implementation phases, project management, and client representation for the infrastructure project.
How to take part
Who can apply
- High minimum turnover relative to estimated contract value
- Specific and narrowly defined reference requirements
- Mandatory professional liability insurance with coverage of EUR 1 million
What to submit
- Submission of offers in accordance with Bundesvergabegesetz BVergG 2018
- Documentation of relevant references
Award criteria
- Price (95% weighting)
- Qualitative criteria (5% weighting)
Tender documents
The visible document package includes a single PDF file labeled as the 'EU-Bekanntmachung' (EU announcement). This file likely contains the official procurement notice, detailing the legal and procedural framework of the tender, including eligibility requirements, submission guidelines, and award criteria. The document may also outline the scope of work and contractual obligations for the general planner role. However, the exact contents of the plans, drawings, or technical specifications are not visible, and no additional files or packages are observed in the supplied context.
Source
Published on Architekturwettbewerb.at. Original title: VE Generalplaner MP16; bitte beachten Sie den Kommentar der Kammer (A&IK).
Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 24 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
