About the project

Development of a feasibility study for flood risk reduction measures in the Ialomița river basin downstream of the Dridu reservoir, including analysis of existing conditions, proposal of at least two technical-economic scenarios, and recommendation of an optimal solution aligned with EU directives and national management plans.

Scope of work

Elaboration of a feasibility study for flood risk reduction in the Ialomița river basin downstream of the Dridu reservoir, including analysis of existing conditions, proposal of at least two technical-economic scenarios, and preparation of supporting documentation in accordance with national regulations. The study must align with the Flood Risk Management Plan and Basin Management Plan for Buzău-Ialomița.

Deliverables

  • Feasibility study (Studiu de fezabilitate - S.F.)
  • Supporting documentation for the feasibility study

Required services

  • Feasibility analysis
  • Technical-economic scenario development
  • Hydraulic engineering design
  • Environmental impact assessment support
  • Coordination of multidisciplinary teams

Pelenoir assessment

This project is primarily focused on engineering and technical planning for flood risk reduction in the Ialomița river basin, with secondary components related to sustainability and environmental performance, as well as specialist consulting for feasibility analysis and multidisciplinary coordination. The scope is centered on developing technical solutions and ensuring compliance with regulatory and environmental standards.

  • Hydraulic engineering design, technical-economic scenario development, and structural planning for flood risk reduction measures in the Ialomița river basin, including infrastructure solutions such as dikes, retention basins, or riverbed modifications.

  • Environmental impact assessment support, alignment with EU directives and national management plans (e.g., Flood Risk Management Plan and Basin Management Plan), and evaluation of sustainability criteria for proposed flood risk reduction measures.

  • Coordination of multidisciplinary teams, feasibility analysis, and advisory services for integrating technical, economic, and regulatory aspects of the flood risk reduction project.

How to take part

Who can apply

  • Legal registration in the country of residence
  • Minimum average annual turnover of 1,109,090.90 RON for the last three financial years (2023-2025)
  • Experience in at least one similar project (hydraulic construction design) in the last three years, with a cumulative value of at least 554,545.45 RON
  • Implementation of a quality management system (SR EN ISO 9001 or equivalent)
  • Implementation of an environmental management system (SR EN ISO 14001 or equivalent)
  • No exclusion grounds under Articles 164, 165, and 167 of Law No. 98/2016
  • Avoidance of conflict of interest as per Articles 58-60 of Law No. 98/2016

What to submit

  • Signed offer with extended electronic signature
  • DUAE (Single Euroformat Declaration) form
  • Form 2 - Declaration on avoidance of conflict of interest
  • Certificates or documents proving experience in similar projects (signed and stamped by beneficiaries)
  • Certificates for quality and environmental management systems (if applicable)
  • Authorized Romanian translation for any documents in foreign languages

Award criteria

  • Price of the offer (40% weight)
  • Experience of the proposed project manager (20% weight)
  • Experience of the proposed hydraulic construction design engineer (20% weight)
  • Reasoning used in evaluating the technical proposal (20% weight)

Source

Published on SEAP. Original title: Servicii de proiectare - elaborarea studiului de fezabilitate pentru: "Reducerea riscului la inundații în bh Ialomița- aval de acumularea Dridu".

Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 22 Oct 2026.