Engineering · Service contract
Flood Risk Reduction in Buzău River Basin upstream of Siriu Reservoir
Development of a feasibility study for an integrated project aimed at reducing flood risks in the Buzău River Basin upstream of the Siriu Reservoir.
- Deadline
- Closed 20 days ago
- Location
- Buzău, Buzău, Romania
- Declared value
- RON 723 140 (≈ EUR 135 313)
About the project
Development of a feasibility study for an integrated project aimed at reducing flood risks in the Buzău River Basin upstream of the Siriu Reservoir. The study will analyze existing conditions, propose at least two technical-economic scenarios, and recommend an optimal solution aligned with EU directives and local management plans.
Scope of work
Development of a feasibility study for flood risk reduction in the Buzău River Basin upstream of the Siriu Reservoir. The study must include analysis of existing conditions, proposal of at least two technical-economic scenarios, and a justified recommendation for the optimal solution. The study must comply with the framework content outlined in Government Decision No. 907/2016 and align with the Buzău-Ialomița Flood Risk Management Plan and Basin Management Plan.
Deliverables
- Feasibility study document compliant with Government Decision No. 907/2016
- Analysis of existing flood risk conditions
- Proposal of at least two technical-economic scenarios
- Justified recommendation for the optimal scenario
- Technical and economic documentation for the recommended solution
Required services
- Feasibility study development
- Technical consultancy for flood protection infrastructure
- Hydrological and hydraulic analysis
- Environmental impact assessment support
- Project management and coordination of multidisciplinary teams
Pelenoir assessment
This project is primarily focused on engineering and technical planning for flood risk reduction infrastructure, supported by specialist consulting for environmental impact assessment and project management, as well as sustainability considerations aligned with regulatory frameworks.
-
Engineering 70%
Hydrological and hydraulic analysis, structural and technical planning for flood protection infrastructure, and development of technical-economic scenarios for flood risk reduction measures.
-
Environmental impact assessment support, project management, and coordination of multidisciplinary teams for the feasibility study.
-
Sustainability 10%
Alignment of the feasibility study with EU directives and local management plans, including sustainability and environmental performance considerations.
How to take part
Who can apply
- Legal registration in the country of residence
- Average annual turnover of at least 1,446,280.98 RON for the last three financial years (2023–2025)
- Experience in at least one similar project (flood protection or hydrological infrastructure) in the last three years, with a cumulative value of at least 723,140.49 RON
- Implementation of a quality management system (ISO 9001 or equivalent)
- Implementation of an environmental management system (ISO 14001 or equivalent)
- No exclusion grounds under Articles 164, 165, and 167 of Law No. 98/2016 (e.g., bankruptcy, professional misconduct, or conflict of interest)
What to submit
- Signed offer with extended electronic signature
- DUAE (Single European Procurement Document) form
- Form 2 – Declaration on conflict of interest avoidance
- Certificates or documents proving experience in similar projects (e.g., reception reports, recommendations)
- Certificates for quality and environmental management systems (ISO 9001 and ISO 14001 or equivalents)
- Financial documents proving average annual turnover (e.g., balance sheets, audit reports)
- Authorized Romanian translations for documents in other languages
Award criteria
- Price of the offer (40% weight)
- Experience of the proposed project manager (20% weight)
- Experience of the proposed hydraulic construction engineer (20% weight)
- Technical proposal reasoning (20% weight)
Source
Published on SEAP. Original title: Servicii de proiectare - elaborarea studiului de fezabilitate "Reducerea riscului la inundații in BH Buzău amonte de acumularea Siriu ".
Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 7 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
