About the project

Construction of a district cooling connection pipeline including pipe-laying and insulation works between Althanstraße 14 and Währinger Gürtel 18-20 (AKH) in Vienna.

Scope of work

General contractor works for the construction, pipe-laying, and insulation of a district cooling connection pipeline between two specified addresses in Vienna. The contract includes earthworks, pipe installation, and thermal insulation.

Deliverables

  • district cooling connection pipeline
  • pipe-laying works
  • thermal insulation works

Required services

  • general contracting for construction
  • pipe-laying
  • insulation works

Pelenoir assessment

This project primarily involves the engineering, technical planning, and construction of a district cooling connection pipeline in Vienna. The scope is dominated by engineering and technical planning for underground utility infrastructure, with a secondary but substantial focus on general contracting for physical construction and installation works.

  • Technical planning, design, and engineering for the district cooling pipeline, including structural and civil engineering for underground utility construction, pipe system design, and integration with existing infrastructure.

  • Physical construction, installation, and general contracting for the district cooling pipeline, including earthworks, pipe installation, and thermal insulation execution.

How to take part

Who can apply

  • suitable for small and medium-sized enterprises (KMU)
  • bidders must assume a specific legal form as per tender documents if awarded
  • eligibility criteria source: tender documents

What to submit

  • offers must be submitted in German
  • electronic submission required
  • offer must remain valid for 5 months

Source

Published on Austrian Public Procurement Search. Original title: WN – 3210083473 - Generalunternehmerleistungen (Bau-, Rohrlege- und Isolierarbeiten) für die Fernkälteverbindungsleitung Althanstraße 14 bis Währinger Gürtel 18-20 (AKH), 1090 Wien.