About the project

Contracting of a Contract Engineer to provide construction supervision, project management, and coordination services for the expansion and redevelopment of the fishing and yacht harbour in Puck. The role includes overseeing construction works, ensuring compliance with technical documentation, environmental requirements, and administrative decisions, as well as managing risks and claims from contractors.

Scope of work

Provision of Contract Engineer services for the expansion and redevelopment of Puck fishing and yacht harbour (Phase II). The scope includes project management, construction supervision, coordination of works, quality control, verification of technical and as-built documentation, participation in acceptance procedures, monitoring of environmental and administrative compliance, risk and claim management, and progress documentation through reports and photographic records.

Deliverables

  • Construction supervision services
  • Project management and coordination
  • Technical and as-built documentation verification
  • Progress reports and photographic documentation

Required services

  • Construction supervision (hydrotechnical, installation, and general construction)
  • Project management
  • Contract administration
  • Risk and claim management

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as its scope is exclusively focused on the procurement of a Contract Engineer to provide construction supervision, project management, and coordination services for the expansion and redevelopment of a fishing and yacht harbour. No architectural, engineering, or other AEC design disciplines are explicitly supported by the extracted facts.

  • Provision of Contract Engineer services, including construction supervision, project management, coordination of works, quality control, verification of technical and as-built documentation, compliance monitoring, risk and claim management, and progress documentation for the harbour expansion and redevelopment.

How to take part

Who can apply

  • Contract Engineer (Resident Engineer/Team Leader) with experience in managing marine hydrotechnical projects valued at least PLN 8,000,000 net
  • Hydrotechnical supervision inspector with experience in yacht harbour projects (minimum 70 berths, PLN 4,000,000 net)
  • Installation supervision inspectors (sanitary and electrical) with relevant experience and qualifications
  • General construction supervision inspector with experience in projects valued at least PLN 500,000 net

What to submit

  • Completed offer form (Załącznik nr 1)
  • Statement of compliance with eligibility criteria (Załącznik nr 2)
  • Declaration of third-party resource provision (Załącznik nr 3)
  • Capital group declaration (Załącznik nr 4)
  • List of personnel for evaluation criteria (Załącznik nr 1a and 6)
  • Joint bidder statement (Załącznik nr 9)
  • Bid bond of PLN 5,000

Award criteria

  • Price (60% weight)
  • Experience of Resident Engineer/Team Leader (20% weight)
  • Experience of Hydrotechnical Supervision Inspector (20% weight)

Tender documents

The visible document package includes tender conditions (Specyfikacja Warunków Zamówienia), submission forms (e.g., Załącznik nr 1 Formularz ofertowy), personnel lists for eligibility verification, and declarations required for bid submission. The package also contains a draft contract (Załącznik nr 7 Umowa) and a detailed description of the contract scope (Załącznik nr 8 Opis Przedmiotu zamówienia). One item, Załącznik nr 10 Dokumentacja projektowa, is labeled as project documentation but lacks a visible filename extension, so its exact content (e.g., drawings, technical plans) is uncertain. The files appear to support bid preparation and compliance but do not include explicit construction drawings or environmental assessments.

Source

Published on e-Zamowienia. Original title: Pełnienie funkcji Inżyniera Kontraktu dla zadania ”Rozbudowa i przebudowa portu rybacko-jachtowego w Pucku - ETAP II”.

Summary and assessment prepared by Pelenoir from the public notice (31 Oct 2026). The original notice and its documents are binding. Page updated 30 Oct 2026.