About the project

Supervision of construction works to improve energy efficiency in existing Tax Office buildings, including verification of design documentation, participation in contractor selection, and financial and technical oversight of the investment.

Scope of work

Supervision of construction works for energy efficiency improvements in Tax Office buildings, including verification of design and cost documentation, participation in contractor selection procedures, financial and technical oversight, and final acceptance of the investment.

Deliverables

  • Supervision of construction works for energy efficiency retrofit
  • Verification of design and cost documentation
  • Participation in contractor selection procedures
  • Financial and technical oversight of the investment
  • Final acceptance of the completed works

Required services

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as its scope is exclusively focused on the supervision and management of construction works for energy efficiency upgrades in existing public administration buildings. No design, engineering, or other AEC disciplines are explicitly supported by the extracted facts.

  • Supervision of construction works for energy efficiency improvements, including verification of design and cost documentation, participation in contractor selection, financial and technical oversight, and final acceptance of the investment.

How to take part

Who can apply

  • Minimum 5 years of experience in construction supervision for energy efficiency or thermal modernization projects in public or collective housing buildings (minimum 400 m², minimum 1,000,000 PLN gross contract value)
  • Team must include: 1 construction supervisor (structural), 1 electrical installations supervisor, and 1 HVAC/sanitary installations supervisor, each with valid Polish or EU-recognized professional licenses and minimum 5 years of experience
  • Proficiency in Polish language for all team members

What to submit

  • Offers must be submitted electronically via the e-Zamawiający platform
  • Documents must be in Polish
  • Required forms: Załącznik nr 8 (service references), Załącznik nr 9 (team qualifications), Załącznik nr 10 (group capital declaration)

Award criteria

  • Price only