Engineering · Service contract
Electrification of six railway sections in Romania (SRCF Cluj)
Development of feasibility studies for the electrification of six railway sections in Romania, divided into three lots: Lot 1 (Arad–Oradea, line 328), Lot 2 (Oradea–Carei–Satu Mare, line 400), and Lot 3 (Satu Mare–Baia Mare–Jibou–Dej, lines 401 and 412).
- Deadline
- Closed 4 days ago
- Location
- Cluj-Napoca, Cluj, Romania
- Declared value
- RON 109.1 m (≈ EUR 20.4 m)
About the project
Development of feasibility studies for the electrification of six railway sections in Romania, divided into three lots: Lot 1 (Arad–Oradea, line 328), Lot 2 (Oradea–Carei–Satu Mare, line 400), and Lot 3 (Satu Mare–Baia Mare–Jibou–Dej, lines 401 and 412). The studies will include technical, economic, and environmental analyses, as well as solutions for fixed traction electricity installations, contact lines, and related railway infrastructure modifications.
Scope of work
The tender requires the preparation of feasibility studies for the electrification of six railway sections in Romania. The studies must include technical, economic, and environmental analyses, as well as solutions for fixed traction electricity installations, contact lines, and modifications to existing railway infrastructure. The deliverables must comply with Romanian and EU regulations, including CS 46/A/170-172/22.09.2026, HG 907/2016, and relevant railway authority standards.
Deliverables
- Feasibility study for railway electrification (Lot 1: Arad–Oradea, Lot 2: Oradea–Carei–Satu Mare, Lot 3: Satu Mare–Baia Mare–Jibou–Dej)
- Technical, economic, and environmental analyses
- Solutions for fixed traction electricity installations (energoalimentare, contact lines, remote control systems)
- Modifications to signaling and ELF installations
- Certificates of verification (CE) for structural subsystems
Required services
- Feasibility study development
- Railway electrification design and consultancy
- Project management
- Financial analysis (Cost-Benefit Analysis)
- Environmental impact assessment
Pelenoir assessment
The project involves the development of feasibility studies for the electrification of six railway sections in Romania, focusing primarily on engineering and technical planning for traction electricity installations and related infrastructure. Secondary scope includes specialist consulting for economic, environmental, and regulatory compliance analyses.
-
Engineering 80%
Design and technical planning for railway electrification, including fixed traction electricity installations, contact lines, signaling modifications, and related infrastructure engineering for the six railway sections.
-
Advisory services for economic and environmental analyses, financial modeling (Cost-Benefit Analysis), and compliance with Romanian and EU regulations for the feasibility studies.
How to take part
Who can apply
- Registration in a commercial or professional register (e.g., ONRC in Romania)
- Demonstrated experience in railway electrification or similar infrastructure projects (minimum contract values: Lot 1: 21.7M RON, Lot 2: 34.8M RON, Lot 3: 52.5M RON)
- Authorization from the Romanian Railway Authority (AFER) for critical railway services (e.g., design and consultancy for contact lines, energoalimentare, PRAM, TM, DEF, and ELF installations)
- ISO 9001 certification or equivalent for quality management systems
- Compliance with exclusion grounds under Romanian procurement law (e.g., no bankruptcy, no professional misconduct, no conflicts of interest)
What to submit
- DUAE (Declaratie Unica pe Propria Raspundere) completed online via SEAP
- Technical and financial proposals
- Certificates of professional experience (e.g., contracts, delivery-acceptance certificates, recommendations)
- Authorization/agreement documents from AFER for critical railway services
- ISO 9001 certification or equivalent
- Participation guarantee (1% of estimated contract value, without VAT)
- Good execution guarantee (10% of contract value, without VAT)
- Documents proving the legal and financial status of the bidder (e.g., ONRC certificates, tax compliance certificates)
Award criteria
- Price (40% weight)
- Experience of key experts (e.g., project manager, IFTE design expert, energoalimentare expert, financial expert) (30% weight)
- Methodology and organization of activities (30% weight)
Source
Published on SEAP. Original title: ”Elaborare Studiu de Fezabilitate pentru obiectivul de investiții: Electrificarea a 6 secții de circulație ale sistemului feroviar din România – SRCF Cluj: Lot 1: Lot 3 - Arad - Oradea pe linia 328, pe intervalul Boiu Bihor (limita SRCF Cluj km 68+000) – Oradea; Lot 2: Lot 4 - Oradea – Carei – Satu Mare, pe linia 400; Lot 3: Lot 5 - Satu Mare – Baia Mare – Jibou - Dej, pe liniile 401 si 412”.
Summary and assessment prepared by Pelenoir from the public notice (13 Oct 2026). The original notice and its documents are binding. Page updated 12 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

