About the project

Examination, geophysical prospecting, and engineering design of flood protection levees along the Drava River, including nature conservation documentation, hydrogeological modeling, and water retention planning.

Scope of work

The procurement covers three lots: (1) preparation of nature conservation documentation, (2) examination of flood protection levees along the Drava River using geophysical methods and hydrogeological modeling, and (3) engineering design of water retention solutions. Services include geophysical prospecting, technical documentation, and contract drafting.

Deliverables

  • Nature conservation plan documentation (Lot 1)
  • Geophysical survey and hydrogeological model of flood protection levees (Lot 2)
  • Engineering design for water retention solutions (Lot 3)
  • Technical specifications and draft contracts

Required services

  • Geophysical prospecting services
  • Engineering design services
  • Hydrogeological modeling
  • Nature conservation planning
  • Water retention engineering

Pelenoir assessment

This project primarily involves engineering and technical planning for flood protection infrastructure, including hydrogeological modeling and water retention design. Secondary disciplines include geophysical surveying and specialist consulting for nature conservation documentation, reflecting a multidisciplinary scope focused on environmental and technical resilience.

  • Engineering design of flood protection levees, hydrogeological modeling, and water retention solutions, including technical documentation and geophysical survey interpretation.

  • Surveying 25%

    Geophysical prospecting and surveying of flood protection levees to assess structural integrity and hydrogeological conditions.

  • Nature conservation planning and documentation to ensure compliance with environmental regulations and ecological considerations.

How to take part

Who can apply

  • Minimum 1 completed reference project in nature conservation documentation (Lot 1)
  • Minimum 1 completed reference project in geophysical survey and hydrogeological modeling (Lot 2)
  • Minimum 1 completed reference project in water retention design (Lot 3)
  • Minimum 2 years of professional experience for specified technical staff (e.g., geophysicist, hydrogeologist, water engineer)
  • Minimum net revenue of 100,000,000 HUF for geophysical services (Lot 2)

What to submit

  • Completed European Single Procurement Document (ESPD) for eligibility criteria
  • Technical and professional staff CVs and qualifications
  • Reference projects documentation (contract details, client contacts, service description, completion dates)
  • Signed declarations of availability for technical staff
  • Draft contracts and priced/unpriced bill of quantities

Award criteria

  • Net contractor fee (HUF) - price criterion
  • Professional experience of technical staff in relevant fields (quality criterion)
  • Specific project references in nature conservation, geophysical survey, and water retention design

Tender documents

The visible document package includes five items: (1) the EU contract notice, which likely contains the official procurement announcement and procedural details; (2) the tender documentation (Ajánlattételi dokumentáció), expected to outline submission forms, eligibility criteria, and procedural instructions for bidders; (3) the technical description (Műszaki leírás), which probably details the geophysical, hydrogeological, and engineering requirements for the levee examination and design; (4) draft contracts (Vállalkozási szerződés tervezetek), likely containing proposed contractual terms and conditions; and (5) a priced or unpriced bill of quantities (Ártáblázat), which may include cost estimates or pricing templates. The exact content of these files cannot be confirmed as they were not downloaded, and their specific formats (e.g., PDF, DOCX) are unknown.

Source

Published on EKR. Original title: Dráva-menti árvízvédelmi töltések vizsgálata.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.