About the project

Demolition planning, cost estimation, construction management, and supervision for eight buildings (total ~8,500 m²) at Killinmäki site. Includes hazardous material surveys, soil contamination studies, waste management planning, and ensuring the operational continuity of two preserved buildings.

Scope of work

Comprehensive demolition planning, cost estimation, construction management, and supervision services for eight buildings (~8,500 m²). Includes hazardous material surveys, soil contamination studies (PIMA), waste management planning, and ensuring the operational continuity of two preserved buildings. The service must cover all tasks defined in the tender documents and attachments.

Deliverables

  • Demolition plans
  • Cost estimate for demolition works
  • Hazardous material and asbestos surveys
  • Soil contamination studies (PIMA)
  • Waste and material utilization plans
  • Construction management for demolition works
  • Supervision and documentation of demolition works
  • Final handover documentation

Required services

  • Demolition planning
  • Cost estimation
  • Construction management
  • Supervision of demolition works
  • Environmental surveys and studies
  • Waste management planning

Pelenoir assessment

This project primarily involves construction management and supervision of demolition works, supported by technical engineering tasks such as demolition planning and environmental surveys. Specialist consulting is also required for waste management and regulatory compliance. The scope does not include architectural design, urban planning, or interior work, focusing instead on demolition-specific services.

  • Construction management, client representation, cost estimation, and supervision of demolition works for eight buildings at the Killinmäki site. Ensuring compliance with environmental regulations, waste management planning, and operational continuity of preserved buildings.

  • Demolition planning, hazardous material surveys, soil contamination studies (PIMA), and technical coordination of waste management and material utilization for the demolition project.

  • Environmental assessments, waste management planning, and ensuring compliance with regulations for hazardous materials and soil contamination during demolition.

How to take part

Who can apply

  • Minimum three comparable demolition project references from the last five years
  • Each reference must cover at least 2,000 m² of demolition work
  • References must demonstrate experience in demolition planning, construction management, and supervision
  • Named responsible project manager, demolition planner, and supervisor with relevant experience and qualifications
  • Disclosure of any subcontractors, liability insurance, and potential conflicts of interest

What to submit

  • Tender documents as defined in the call for tenders
  • References for comparable projects
  • Details of responsible personnel and their qualifications
  • Disclosure of subcontractors and liability insurance
  • Declaration of no conflicts of interest

Award criteria

  • Lowest price (fixed-price task packages, VAT 0%)

Source

Published on HILMA. Original title: Killinmäen rakennusten purkusuunnittelu, kustannusarvio, rakennuttaminen ja purkutöiden valvonta.

Summary and assessment prepared by Pelenoir from the public notice (18 Nov 2026). The original notice and its documents are binding. Page updated 17 Nov 2026.