Architecture · Design contest
Cultural center with performance hall and cinema in Talmont-Saint-Hilaire
A 500-seat performance hall and two-screen cinema in one cultural center.
- Deadline
- Closed 6 days ago
- Location
- Talmont-Saint-Hilaire, Pays de la Loire, France
- Declared value
- EUR 12 m
About the project
Construction of a cultural center including a 500-seat performance hall, a two-screen cinema (200 and 80 seats), and shared spaces such as a lobby and heating room. The project involves architectural and engineering design services (maîtrise d'oeuvre) for the facility.
Why it matters
A ̄-seat performance hall and two-screen cinema in one cultural center. The esquisse isn’t just a sketch. It’s the first draft of the town’s public life.
Talmont-Saint-Hilaire’s cultural center starts with a 500-seat performance hall and two-screen cinema, but the esquisse is more than a sketch. It’s the first public explanation of what this place will value.
The design team’s questions about seating, lighting, and shared spaces become the first tangible answers to what this community wants to celebrate.
Scope of work
Restricted design competition for multidisciplinary architectural and engineering services (maîtrise d'oeuvre) for a cultural center. The scope includes base missions (with VISA), complementary missions (CSSI-STD/SED-PZ-DLE-MOB-SIGN), and an optional PSE (SYNTH) mission. The competition is followed by a negotiated procedure without prior publicity for the award of the construction contract to the winning team.
Deliverables
- Architectural and engineering design (esquisse level study)
- Complementary mission documents (CSSI, STD/SED, PZ, DLE, MOB, SIGN)
- Optional PSE (SYNTH) mission documents
Required services
- Architectural design
- Engineering design
- Structural engineering
- Building services engineering
- Project coordination (maîtrise d'oeuvre)
Pelenoir assessment
This project is a restricted design competition for a cultural center combining architectural and engineering services. The primary focus is on architectural design for the performance hall, cinema, and shared spaces, while engineering and technical planning cover structural, building services, and safety coordination aspects.
-
Architecture 60%
Architectural concept, building design, and overall spatial organization for the cultural center, including the 500-seat performance hall, two-screen cinema, and shared spaces such as the lobby and heating room.
-
Engineering 40%
Structural engineering, building services engineering, and technical coordination for the performance hall, cinema, and shared infrastructure, including complementary missions such as CSSI (safety coordination), STD/SED (technical studies), and DLE (environmental performance).
How to take part
Who can apply
- Multidisciplinary teams with competencies described in the competition regulations (règlement de concours)
- Teams must produce conforming submissions to receive the prime
- Maximum of 3 candidates shortlisted
What to submit
- Study at esquisse level
- Documents conforming to the competition regulations
Award criteria
- Environmental criteria (critères environnementaux)
Source
Published on BOAMP. Original title: Maîtrise d'oeuvre pour la construction d'un pôle culturel à Talmont Saint Hilaire comprenant une salle de spectacle de 500 places et un cinéma de deux salles (200 et 80 places)..
Summary and assessment prepared by Pelenoir from the public notice (21 Oct 2026). The original notice and its documents are binding. Page updated 21 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



