About the project

Design documentation and author supervision for the extension of county road 1925D (ul. Zielona) from the railway crossing PKP Nadolice Małe to the intersection with county road 1535D, including a new intersection in Nadolice Małe, Czernica municipality. The project covers conceptual design, construction documentation, required permits (including ZRID decision), environmental assessments, traffic organisation, and author supervision during construction.

Scope of work

The tender covers the preparation of design documentation (conceptual, building, and execution projects) for the extension of a 400 m section of county road 1925D, including traffic organisation, environmental assessments, utility infrastructure adjustments, and author supervision during construction. The project is divided into three stages: (1) design documentation with required permits, (2) land division and boundary marking, and (3) author supervision during construction.

Deliverables

  • Conceptual design (two variants)
  • Building permit documentation (ZRID decision)
  • Execution projects for road, drainage, lighting, traffic signals, and green areas
  • Environmental assessments and water permits
  • Traffic organisation plans (permanent and temporary)
  • Land division and geodetic documentation
  • Cost estimates (bill of quantities, investment cost estimate)
  • Visualisations (2 locations)
  • Author supervision during construction

Required services

  • Engineering design services (road, drainage, lighting, traffic signals)
  • Author supervision (art. 20.1.4 of the Polish Construction Law)
  • Geotechnical surveys
  • Traffic analysis and forecasting
  • Environmental impact assessments
  • Utility infrastructure adjustments
  • Public consultation

Pelenoir assessment

The project is primarily an engineering and technical planning assignment for the extension of a county road, covering design documentation, permits, and technical assessments. Author supervision during construction is a secondary but required component, ensuring compliance with the design and legal requirements. The scope does not support architectural, urban planning, or other AEC disciplines beyond these two groups.

  • Design and technical planning for the 400 m road extension, including structural, civil, drainage, lighting, traffic signals, and utility infrastructure engineering. Preparation of conceptual, building permit, and execution documentation, as well as environmental assessments and traffic organisation plans.

  • Author supervision during construction, ensuring compliance with design documentation and Polish Construction Law (art. 20.1.4). This includes oversight of construction execution and coordination with the design team.

How to take part

Who can apply

  • Experience in designing roads of at least class Z (minimum 400 m length) with ZRID decision obtained within the last five years
  • Qualified personnel: road design coordinator (unlimited road engineering licence) and sanitary design specialist (unlimited drainage licence)
  • Consortium or subcontracting allowed if requirements are met by at least one member

What to submit

  • Completed offer form (Annex 1 to SWZ)
  • Pricing table (Annex 1.1 to SWZ)
  • Non-price criteria form (Annex 1.2 to SWZ)
  • Statement on exclusion and eligibility (Annex 2 to SWZ)
  • List of services performed (Annex 6 to SWZ)
  • List of personnel (Annex 7 to SWZ)
  • Bid bond (if submitted as bank/insurance guarantee or surety)
  • Power of attorney (for consortia or representatives)

Award criteria

  • Price (60% weight)
  • Experience of the road design specialist (40% weight)

Tender documents

The visible document package includes 12 files: the main tender specifications (SWZ) in PDF, editable submission forms (DOCX) for offers, pricing tables, and non-price criteria, as well as templates for eligibility statements and personnel lists. The package also contains the draft contract (PDF), a data processing agreement (PDF), and a detailed scope of work (PDF). The files likely cover all required submission documents, including technical and administrative forms, but the exact content of the PDFs (e.g., detailed drawings, maps, or technical annexes) cannot be confirmed without access. The editable DOCX files suggest a focus on procedural compliance and bid preparation.

Source

Published on e-Zamowienia. Original title: Oprac. dok. proj.dla zad.:Rozbudowa DP1925D ul. Zielonej na odc. od przej.kolejow.PKP Nadolice Małe do skrzyż. z DP1535D wraz ze skrzyż. w m. Nadolice Małe,gm.Czernica wraz ze sprawowaniem nadz.autor..

Summary and assessment prepared by Pelenoir from the public notice (28 Nov 2026). The original notice and its documents are binding. Page updated 27 Nov 2026.