Architecture · Service contract
Construction of Mixed-Use Building and Multifunctional Training Ground for High-Altitude Rescue
A high-altitude rescue training ground needs architects who turn operational needs into public use.
- Deadline
- Closed 5 days ago
- Location
- Ciolpani, Ilfov, Romania
- Declared value
- RON 289 250 (≈ EUR 54 124)
About the project
Planning and design services for a feasibility study for a mixed-use building and a multifunctional training ground for high-altitude rescue operations. The project includes technical, economic, and functional feasibility assessments, topographic surveys, geotechnical studies, and the preparation of necessary documentation for approvals.
Why it matters
Architects design a training ground that integrates operational needs with public use, drafting the first story of daily rescue operations.
The Ciolpani project’s feasibility study for a mixed-use building and training ground explicitly connects high-altitude rescue operations with public accessibility.
This reveals how specialised operational needs can shape public spaces, turning rescue training into a daily narrative for the community.
Scope of work
Elaboration of a Feasibility Study (SF) for the construction of a mixed-use building and a multifunctional training ground for high-altitude rescue. The study includes topographic surveys, geotechnical studies, environmental and fire safety analyses, technical-economic variant comparisons, and preparation of documentation for approvals and permits.
Deliverables
- Feasibility Study (SF) with written and drawn components
- Topographic survey
- Geotechnical study
- Environmental impact analysis
- Fire safety analysis
- Technical-economic variant comparisons
- General and object-specific cost estimates
- List of quantities and equipment
- Investment implementation schedule
- Documentation for obtaining approvals and agreements
Required services
- Feasibility study preparation
- Topographic survey
- Geotechnical investigation
- Environmental impact assessment
- Fire safety analysis
- Technical-economic variant comparison
- Coordination of interdisciplinary specialties
- Preparation of cost estimates and schedules
Pelenoir assessment
The project involves the preparation of a feasibility study for a mixed-use building and a multifunctional training ground for high-altitude rescue. The primary focus is on architectural design and conceptual planning, supported by engineering and technical assessments, as well as site-specific urban design for the training facility.
-
Architecture 50%
Architectural concept and building design for the mixed-use building, including functional layout, spatial organization, and design development for the feasibility study phase.
-
Engineering 30%
Structural, civil, and technical engineering for the mixed-use building and training ground, including geotechnical studies, topographic surveys, and technical-economic variant comparisons.
-
Site planning and integration of the multifunctional training ground within the project area, including spatial organization and functional zoning for high-altitude rescue operations.
How to take part
Who can apply
- Registration in a commercial or professional register
- Minimum three years of experience in similar feasibility study services for civil, industrial, or special-purpose constructions
- Demonstrated experience of key personnel (coordinator/architect, structural engineer, installations coordinator) in comparable projects
- Compliance with exclusion grounds under Romanian public procurement law (Law 98/2016)
What to submit
- Completed DUAE (Declaration on Own Responsibility)
- Certificates of registration for legal entities
- References for similar services executed in the last three years
- CVs and experience documentation for key personnel
- Subcontracting agreements (if applicable)
- Translated documents (if not in Romanian)
Award criteria
- Price of the offer (40%)
- Specific experience of the coordinator/architect (20%)
- Specific experience of the structural engineer (25%)
- Specific experience of the installations coordinator (15%)
Source
Published on SEAP. Original title: Servicii de proiectare - faza Studiu de Fezabilitate - pentru obiectivul de investiții: „CONSTRUIREA UNEI CLĂDIRI CU FUNCȚIONALITATE MIXTĂ ȘI A UNUI POLIGON MULTIFUNCȚIONAL DE ANTRENAMENT PENTRU SALVARI DE LA INALTIME".
Summary and assessment prepared by Pelenoir from the public notice (2 Nov 2026). The original notice and its documents are binding. Page updated 2 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
