Architecture · Service contract
Collonges-en-Mont-d’Or UEHC to UJPE Transformation
Transformation of an existing Educational Collective Accommodation Unit (UEHC) into a Judicial Priority Educational Unit (UJPE), including programming studies, demolition, landscaping, and support for the award of the project management contract.
- Deadline
- Closed 29 days ago
- Location
- Collonges-en-Mont-d’Or, Auvergne-Rhône-Alpes, France
About the project
Transformation of an existing Educational Collective Accommodation Unit (UEHC) into a Judicial Priority Educational Unit (UJPE), including programming studies, demolition, landscaping, and support for the award of the project management contract.
Scope of work
Programming studies and assistance for the award of the project management contract (maîtrise d’œuvre) for the transformation of an existing educational accommodation unit into a judicial priority educational unit. Includes demolition, landscaping, circular economy and reuse, and HQE (High Environmental Quality) standards.
Deliverables
- Programming studies
- Support for the award of the project management contract (maîtrise d’œuvre)
Required services
- Building programming
- Construction economics
- Land valuation
- Circular economy and reuse
- Demolition and securing
- High Environmental Quality (HQE) compliance
- Landscaping
Pelenoir assessment
The project involves the transformation of an existing educational accommodation unit into a judicial priority educational unit, with a primary focus on architectural programming and design. Secondary disciplines include landscape architecture, sustainability and building performance, urban design and planning, and engineering and technical planning, reflecting the multi-disciplinary nature of the required services.
-
Architecture 50%
Architectural programming studies and conceptual design for the transformation of the existing educational accommodation unit into a judicial priority educational unit, including spatial planning and functional layout.
-
Design of outdoor spaces, green areas, and landscaping for the transformed facility, including compliance with environmental and aesthetic requirements.
-
Sustainability 15%
Implementation of High Environmental Quality (HQE) standards, circular economy principles, and sustainability measures for the transformation project.
-
Integration of the transformed facility within its urban context, including site planning and public realm considerations as part of the landscaping and demolition scope.
-
Engineering 10%
Technical studies related to demolition, structural adaptations, and infrastructure planning for the transformation of the facility.
How to take part
Who can apply
- Annual turnover requirement
- Technical capacity: diplomas, CVs, and references
- Competence in programming, construction economics, land valuation, circular economy, demolition, HQE, and landscaping
- Experience in project management contract (maîtrise d’œuvre) competitions
What to submit
- Technical offer
- Financial offer
- Diplomas and CVs
- References
Award criteria
- Technique (60%)
- Prix (30%)
- Environnement (10%)
Source
Published on BOAMP. Original title: Transformation de l’Unité Educative d’Hébergement Collectif (UEHC) de Collonges-en-Mont-d’Or en Unité Judiciaire à Priorité Éducative (UJPE).
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.