About the project

Technical documentation for the closure and post-closure monitoring of the Cicani ash and slag deposit at final elevation, including design services for a tailings dam at the Rovinari Power Plant site.

Scope of work

Design services for the closure and post-closure monitoring of the Cicani ash and slag deposit at final elevation, including technical documentation, compliance with environmental and safety regulations, and submission of a methodology for service delivery.

Deliverables

  • Technical documentation for deposit closure and post-closure monitoring
  • Design for tailings dam (baraj de zgură și cenușă)
  • Methodology for service execution

Required services

  • Design services for hydraulic structures (tailings dam)
  • Environmental monitoring planning
  • Technical documentation preparation

Pelenoir assessment

The project primarily involves engineering and technical planning for the design of a tailings dam and closure of an ash and slag deposit, with a secondary focus on environmental sustainability and post-closure monitoring. The scope is heavily weighted toward hydraulic engineering but also includes critical sustainability components to ensure regulatory compliance and long-term performance.

  • Design of the tailings dam structure, hydraulic engineering, and technical planning for the closure and post-closure monitoring of the ash and slag deposit, including compliance with environmental and safety regulations.

  • Environmental monitoring planning, compliance with environmental regulations, and ensuring the long-term sustainability of the closed deposit, including post-closure monitoring parameters.

How to take part

Who can apply

  • Registration in a commercial register
  • No exclusion grounds under Art. 180 of Law 90/2016
  • Minimum three years of experience in similar design services for category B hydraulic structures (constructii hidrotehnice de importanta deosebita)
  • Cumulative experience value of at least 130,000 RON in similar services
  • Compliance with labor, social, and environmental legislation

What to submit

  • Completed Documentul Unic de Achiziții European (DUAE)
  • Guarantee for participation (GP) of 1,000 RON
  • Technical and financial proposals in Romanian
  • Documents demonstrating experience and legal compliance

Award criteria

  • Price (80% weight): Lowest price receives maximum score; others calculated proportionally
  • Technical methodology (20% weight): Evaluation based on understanding of scope, risk identification, and proposed solutions

Source

Published on SEAP. Original title: Elaborare documentație tehnică pentru Închidere și monitorizare post-închidere depozit de zgură şi cenușă Cicani avarie la cota finală, din cadrul Sucursalei Electrocentrale Rovinari.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 6 Oct 2026.