About the project

Technical design services for the closure and ecological rehabilitation of the decommissioned mining site Puț 5 and associated settling ponds 2, 3, and 3A in Harghita County, including environmental safety and restoration works.

Scope of work

Technical design services for the closure and ecological rehabilitation of the decommissioned mining site Puț 5 and settling ponds 2, 3, and 3A, including environmental safety measures and restoration solutions. The project is approved for closure under Government Decision HG 898/2002.

Deliverables

  • Technical design documentation for closure and ecological rehabilitation works
  • Environmental safety and restoration solutions for the mining site and settling ponds

Required services

  • Technical design for industrial processes and production (Servicii de proiectare tehnica pentru procese si productie industriale)
  • Environmental remediation and ecological reconstruction

Pelenoir assessment

The project involves the closure and ecological rehabilitation of a decommissioned mining site and associated settling ponds, requiring technical design services for environmental safety and restoration. The primary focus is on engineering and technical planning, with a secondary emphasis on sustainability and building performance to ensure ecological compliance and long-term environmental safety.

  • Technical design for the closure and ecological rehabilitation of the decommissioned mining site and settling ponds, including structural and civil engineering solutions for environmental safety and restoration works.

  • Development of environmental safety measures, ecological restoration solutions, and compliance with sustainability standards for the mining site and settling ponds.

How to take part

Who can apply

  • Registration in a commercial or professional register under the laws of the country of residence
  • No exclusion grounds related to environmental, labor, or social legislation
  • No bankruptcy, insolvency, or similar legal situations
  • No grave professional misconduct or false declarations
  • Implementation of a quality management system compliant with SR EN ISO 9001
  • Relevant CAEN code corresponding to the contract object in the ONRC certificate
  • All foreign documents must be accompanied by authorized Romanian translations

What to submit

  • DUAE (Documentul Unic de Achiziție Europeană)
  • ONRC certificate (issued no earlier than 30 days before the submission deadline)
  • Documents proving compliance with SR EN ISO 9001 (e.g., quality manuals, procedural documents, or accredited certification)
  • Authorized Romanian translations for all foreign-language documents

Award criteria

  • Lowest price (Pretul cel mai scazut)

Source

Published on SEAP. Original title: Proiect tehnic de închidere și ecologizare a obiectivului minier Puț 5 - iazurilor nr. 2, 3 și 3A, județul Harghita.

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 29 Oct 2026.