Image 1 from the tender documents: Campus Sevenwolden/KiiM expansion and new construction, Heerenveen, Netherlands
1 image from the tender documents, TenderNed

About the project

Integrated design and advisory services (Total Engineering) for the expansion and new construction of an educational campus, including preliminary design (VO) through execution-ready design (UO), coordination of all design disciplines, and design supervision during construction. Approximately 3,600 m² gross floor area.

Scope of work

Integrated design and advisory services for the expansion and new construction of Campus Sevenwolden/KiiM, covering preliminary design (VO) through execution-ready design (UO), coordination of all design disciplines, and design supervision during construction. The project includes architectural, structural, technical, and landscape design services.

Deliverables

  • Preliminary design (VO)
  • Execution-ready design (UO)
  • Coordination of design disciplines
  • Design supervision during construction

Required services

Pelenoir assessment

The Campus Sevenwolden/KiiM expansion and new construction project is a multi-disciplinary design effort requiring integrated architectural, engineering, landscape, sustainability, and project management services. The primary focus is on architectural design, with significant contributions from engineering, landscape architecture, and sustainability disciplines, all coordinated under a Total Engineering approach.

  • Architectural concept, building design, and spatial planning for the new construction and expansion of the Campus Sevenwolden/KiiM educational campus, including preliminary design (VO) through execution-ready design (UO).

  • Structural engineering, technical design services (e.g., building services, infrastructure), and coordination of technical disciplines to ensure execution-ready designs (UO).

  • Landscape design, outdoor space planning, and integration of the campus expansion with its surrounding environment.

  • Sustainability strategies, circularity, energy efficiency, and building performance optimization for the campus design.

  • Design coordination, supervision during construction, and integration of all design disciplines under the Total Engineering approach.

How to take part

Who can apply

  • Participation is not reserved
  • Electronic submission required
  • Submissions must be in Dutch
  • Minimum of 5 candidates invited for the second phase
  • Maximum of 5 candidates invited for the second phase

What to submit

  • Electronic submission via TenderNed
  • Submissions in Dutch
  • Standard reference form (Bijlage F)

Award criteria

  • G1: honorariumaanbieding (price) – 20%
  • G2: Samenwerking & integraliteit Total Engineering-team – 10%
  • G3: Architectuur & ruimtelijk concept – 30%
  • G4: Landschap & inpassing – 10%
  • G5: Installaties & toekomstbestendigheid – 10%
  • G6: Duurzaamheid & circulariteit – 10%
  • G7: Kostenbewust ontwerpen & risicobeheersing – 10%

Tender documents

The visible document package includes PDF files likely containing the official tender notice, selection guidelines for the design team, task lists, contract templates (e.g., concept agreement for architect, structural engineer, and technical advisors), general procurement conditions, and planning schedules. There is also a DOCX file for standard reference forms and a ZIP archive containing the full document set. The files appear to cover administrative, legal, and procedural requirements for the design competition, but the exact content of drawings, technical specifications, or detailed design briefs remains unknown without access to the files.

Images from the tender documents

Source

Published on TenderNed. Original title: Total Engineering – Nieuwbouw en uitbreiding Campus Sevenwolden/KiiM.

Summary and assessment prepared by Pelenoir from the public notice (9 Nov 2026). The original notice and its documents are binding. Page updated 8 Nov 2026.