About the project

Design of a two-way access road, sidewalk, bicycle path or pedestrian-bicycle route, shoulders, and road drainage to serve the Bulwary nad Nidą waterfront area in Pińczów. The project includes obtaining all necessary opinions, agreements, and building permits or road investment permits. Two route concepts must be developed and approved before detailed design begins.

Scope of work

Development of design documentation for a two-way access road to the Bulwary nad Nidą waterfront area, including sidewalks, bicycle paths or pedestrian-bicycle routes, shoulders, and road drainage. The project requires obtaining necessary approvals, permits, and conducting geological surveys. Two route concepts must be presented for approval before detailed design. The design must comply with accessibility standards for people with special needs and allow for future expansion to accommodate heavy vehicles over 12 tons.

Deliverables

  • design documentation for access road
  • two route concepts for approval
  • geological survey report
  • opinions, agreements, and permits (including building permit or road investment permit)

Required services

  • architectural and engineering design services
  • traffic and transportation planning
  • geological surveys
  • coordination of approvals and permits

Pelenoir assessment

The project primarily involves urban design and planning for the integration of an access road with a waterfront area, alongside technical engineering for road infrastructure, drainage, and geological surveys. The scope requires multidisciplinary collaboration to deliver route concepts, detailed design, and necessary permits.

  • Development of two route concepts for the access road, sidewalk, and bicycle path, including spatial planning and integration with the Bulwary nad Nidą waterfront area. Ensuring compliance with urban design standards and accessibility requirements for public infrastructure.

  • Design of the two-way access road, road drainage, shoulders, and geological surveys. Technical planning for compliance with road investment permits, accessibility standards, and future expansion requirements for heavy vehicles.

How to take part

Who can apply

  • compliance with Polish Public Procurement Law (art. 94)
  • meeting conditions specified in the SWZ (Specification of Essential Terms of the Contract)

What to submit

  • completed offer form (zał.1)
  • subcontractor declarations (zał.2)
  • statements on meeting participation conditions (zał.3)
  • land-related statements (zał.4)
  • group-related documents (zał.5)
  • list of key personnel (zał.6)
  • signed draft contract (zał.7)
  • list of completed services (zał.8)
  • commitment to provide resources (zał.9)
  • contractor’s statement (zał.10)

Award criteria

  • Price (60% weight)
  • Extended quality guarantee period (40% weight)

Tender documents

The visible document package includes 12 files, primarily in PDF and DOCX formats. The files named 'SWZ_droga_Bulwary.pdf' and 'ogloszenie_droga_Bulwary.pdf' likely contain the Specification of Essential Terms of the Contract and the official tender announcement, respectively. The remaining files, labeled as 'zał.' (attachments), appear to be submission forms, declarations, and draft agreements required for participation, such as offer forms, subcontractor statements, and a draft contract. The exact content of these files cannot be confirmed without access, but their titles suggest they cover eligibility, compliance, and procedural requirements. No technical drawings or detailed design files are visibly named in this package.

Source

Published on e-Zamowienia. Original title: Droga do „Bulwarów nad Nidą”. – opracowanie dokumentacji projektowej.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.