Urban design and planning · Service contract
Bucharest Metro Network Expansion – M2 Line Extension North
Development of feasibility study, environmental impact assessment, and strategic environmental evaluation for the extension of Bucharest Metro Line M2 in the northern area, including approximately 2 km of new metro infrastructure and 2 new stations.
- Deadline
- Closed 4 days ago
- Location
- Bucharest, București, Romania
- Declared value
- RON 6.1 m (≈ EUR 1.1 m)
About the project
Development of feasibility study, environmental impact assessment, and strategic environmental evaluation for the extension of Bucharest Metro Line M2 in the northern area, including approximately 2 km of new metro infrastructure and 2 new stations. The project aims to connect the existing M2 line at Pipera to Petricani (Voluntari) and ensure integration with the city's transport network.
Scope of work
Elaboration of a feasibility study, environmental impact assessment, and strategic environmental evaluation for the extension of Bucharest Metro Line M2 (Pipera–Petricani section). The project includes multidisciplinary investigations (topographic, geotechnical, hydrological, traffic studies), technical-economic analyses, route alternative evaluations, and obtaining necessary approvals. The contract is structured in four phases: project initiation, option analysis, preliminary design (including feasibility study), and support for expropriation, financing, and contracting.
Deliverables
- Feasibility Study (Studiu de Fezabilitate)
- Environmental Impact Assessment
- Strategic Environmental Evaluation
- Preliminary design documentation
- Technical, economic, and approval studies
- Expropriation and financing documentation
- Procurement support documentation
- Final project report
Required services
- feasibility studies
- environmental impact assessments
- strategic environmental evaluations
- topographic studies
- geotechnical studies
- hydrological studies
- traffic studies
- technical-economic analyses
- route alternative evaluations
- expropriation support
- financing documentation preparation
- procurement assistance
Pelenoir assessment
This project primarily involves urban design and planning for a metro extension, supported by engineering and technical planning for infrastructure development. Specialist consulting is also required for environmental assessments and regulatory compliance. The scope is multidisciplinary, with no single discipline dominating the entire project.
-
Urban integration and spatial planning for the metro extension, including route alternative evaluations, transport network connectivity, and public-realm planning to ensure alignment with Bucharest's urban development goals.
-
Engineering 35%
Technical planning for metro infrastructure, including geotechnical, hydrological, and structural studies, as well as engineering design for tunnels, stations, and systems integration.
-
Specialist advisory services for environmental impact assessments, strategic environmental evaluations, expropriation support, and financing documentation preparation.
How to take part
Who can apply
- Legal registration in a commercial register (or equivalent for foreign operators)
- No exclusion grounds under Articles 164, 165, and 167 of Romanian Public Procurement Law (Law 98/2016)
- Minimum average annual turnover of RON 6,109,320 over the last 3 years (2023–2025)
- Demonstrated experience in similar projects (maximum 3 contracts with a cumulative value of at least RON 6,000,000 in the last 5 years)
- ISO 9001 certification (or equivalent) for quality management systems
- Subcontractors must meet the same eligibility criteria if relied upon for capacity
What to submit
- Completed European Single Procurement Document (DUAE)
- Participation guarantee
- Financial proposal
- Technical proposal (including organizational plan, work plan, sustainability plan, and key expert experience)
- Certificates of good execution or equivalent documents for similar projects
- ISO 9001 certification (or equivalent)
- Subcontractor agreements (if applicable)
- Documents proving legal registration and tax compliance
Award criteria
- Price (40% weight): lowest price receives maximum points, others scored proportionally
- Technical proposal (60% weight): divided into four sub-factors – organizational adequacy (15 points), work plan adequacy (15 points), sustainability plan quality (15 points), and key expert experience (15 points)
Source
Published on SEAP. Original title: Servicii de elaborare Studiu de Fezabilitate, impact asupra mediului și evaluarea strategică adecvată pentru obiectivul de investiții ”DEZVOLTAREA REȚELEI DE METROU ÎN ZONA BUCUREȘTI NORD – EXTENSIA MAGISTRALEI 2”.
Summary and assessment prepared by Pelenoir from the public notice (25 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
