About the project

Development of a traffic model by integrating two existing models, and creation of transit management measures and a route concept for two sections in the greater Innsbruck area on the A12 and A13 highways.

Scope of work

Development of an integrated traffic model from two existing models, and creation and evaluation of transit management measures and a route concept for two highway sections in the greater Innsbruck area. The project includes technical studies, road construction services, and engineering consultancy.

Deliverables

  • integrated traffic model
  • transit management measures
  • route concept for A12 and A13 highway sections

Required services

  • technical studies
  • road construction services
  • engineering consultancy

Pelenoir assessment

This project primarily involves engineering and technical planning for highway infrastructure and traffic management, with a secondary focus on urban and transport planning to integrate the proposed measures into the regional context.

  • Development of an integrated traffic model, technical studies, and engineering consultancy for transit management measures and route concepts on the A12 and A13 highways.

  • Creation of a route concept and transit management measures for the greater Innsbruck area, including spatial planning and integration of highway sections into the regional transport network.

How to take part

Who can apply

  • no restrictive participation conditions

What to submit

  • electronic submission of offers
  • documents in PDF, XLS, or other specified formats

Award criteria

  • reference projects of project leader (points)
  • education and professional experience of project leader (points)
  • education and professional experience of deputy project leader (points)
  • reference projects of deputy project leader (points)
  • gender parity (points)

Tender documents

The visible document package includes PDF files labeled as performance specifications, project descriptions, general and special contract terms, bid forms, and technical appendices. One ZIP file named 'Beilagen.zip.zip' likely contains supplementary materials such as plans, drawings, or additional technical documents. The package appears to cover all contractual, technical, and procedural requirements for submitting a bid. However, the exact contents of the ZIP file and some PDFs remain uncertain without access, as the portal requires login for download.

Source

Published on Austrian Public Procurement Search. Original title: A12 / A13 Intelligentes Transitmanagement Brennerkorridor + Streckenkonzept Großraum Innsbruck - Erarbeitung Verkehrsmodell und Maßnahmen Transitmanagement / Streckenkonzept.

Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 1 Sep 2026.