Project and construction management · Service contract
Bouzule Experimental Farm ICPE Compliance Framework Agreement
An experimental farm’s ICPE compliance needs project management that turns regulatory frameworks into traceable decisions.
- Deadline
- 2 days left to apply
- Location
- Laneuvelotte, Grand Est, France
- Declared value
- EUR 800 000
About the project
Framework agreement for project management services to ensure ICPE (Installations Classées pour la Protection de l'Environnement) compliance and other works at the Bouzule experimental farm in Laneuvelotte.
Why it matters
ICPE compliance for an experimental farm needs project management that turns regulatory frameworks into traceable decisions.
Scope of work
Project management services for ICPE compliance and other works at the Bouzule experimental farm, including environmental and regulatory compliance, design, and execution oversight.
Deliverables
- Project management services for ICPE compliance
- Design and execution oversight for environmental compliance works
Required services
- Project management (maîtrise d'œuvre)
- Environmental compliance consulting
- Design and regulatory coordination
Pelenoir assessment
This project is primarily a project management engagement for ICPE compliance at an agricultural facility, with a focus on coordinating environmental and regulatory works. Technical engineering and sustainability consulting are secondary but integral components, supporting the design, execution, and compliance oversight required for the farm's infrastructure upgrades.
-
Project management (maîtrise d'œuvre) for ICPE compliance, including coordination of environmental compliance works, regulatory alignment, and execution oversight at the Bouzule experimental farm.
-
Engineering 20%
Technical engineering and design for environmental compliance, including infrastructure upgrades, regulatory assessments, and technical coordination to meet ICPE standards.
-
Sustainability 10%
Environmental compliance consulting, sustainability assessments, and certification support to ensure adherence to ICPE regulations and broader environmental protection standards.
How to take part
Who can apply
- Minimum 3 and maximum 5 economic operators for the framework agreement
- Qualification requirements as per procurement documents
What to submit
- Electronic submission required
- Documents in French
Award criteria
- Social criteria
- Environmental criteria
Source
Published on BOAMP. Original title: Accord-cadre de maîtrise d'œuvre pour la mise en conformité ICPE et divers – Ferme expérimentale de la Bouzule – 54580 Laneuvelotte.
Summary and assessment prepared by Pelenoir from the public notice (28 Oct 2026). The original notice and its documents are binding. Page updated 28 Oct 2026.