About the project

Preparation of design and cost documentation for the construction of Botaniczna Street, including a pedestrian and cycle path, drainage, and lighting over approximately 580 meters in Dąbrowa Chotomowska village, Jabłonna municipality.

Scope of work

Preparation of design and cost documentation for the construction of a 580-meter section of Botaniczna Street, including a pedestrian and cycle path, drainage (French drain), and LED street lighting. The project also includes author supervision during implementation.

Deliverables

  • Design documentation for road construction
  • Cost estimation documentation
  • Documentation for pedestrian and cycle path
  • Drainage system design (French drain)
  • Street lighting design (LED technology)

Required services

  • Architectural and engineering design services
  • Cost estimation services
  • Author supervision during construction

Pelenoir assessment

This project is primarily an engineering and technical planning assignment focused on the design and cost documentation for road infrastructure, including drainage and lighting. A secondary component involves project and construction management through author supervision during implementation.

  • Design and technical planning for road construction, including structural and civil engineering for the 580-meter street section, drainage systems (French drain), and LED street lighting infrastructure.

  • Author supervision during the construction phase to ensure compliance with the design documentation and cost estimates.

How to take part

Who can apply

  • Minimum 2 completed design documentations for road construction (minimum 500 meters) with pedestrian/cycle paths, drainage, and lighting in the last 3 years
  • At least one person with unlimited road design qualifications under Polish law
  • At least one person with electrical engineering qualifications for LED lighting design
  • Experience in preparing design documentation for similar road infrastructure projects

What to submit

  • Offer prepared according to Załącznik Nr 1 do SWZ
  • Statement under art. 125 ust. 1 ustawy Pzp (Załącznik nr 2 do SWZ)
  • Declaration of compliance with eligibility criteria (Załącznik nr 5 and 6 to SWZ)
  • Power of attorney (if applicable)
  • Bid bond documentation (if not in cash)
  • Evidence of experience for key personnel

Award criteria

  • Price (60% weight)
  • Experience of the designer (40% weight)

Source

Published on e-Zamowienia. Original title: WYKONANIE DOKUMENTACJI PROJEKTOWO – KOSZTORYSOWEJ BUDOWY DROGI UL. BOTANICZNEJ WE WSI DĄBROWA CHOTOMOWSKA GM. JABŁONNA WRAZ Z INFRASTRUKTURĄ TOWARZYSZĄCĄ.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 1 Oct 2026.