About the project

Preparation of complete design documentation for the construction of a bicycle path along national road 57, including compliance with accessibility requirements for people with disabilities.

Scope of work

Preparation of complete design documentation for a bicycle path along national road 57, including compliance with accessibility standards for people with disabilities. The documentation must be based on the provided concept and OPZ (Technical Conditions).

Deliverables

  • complete design documentation for bicycle path construction
  • documentation compliant with accessibility requirements (art. 100 ust. 1 ustawy)

Required services

Pelenoir assessment

This project primarily involves the architectural and design documentation for a bicycle path, including its alignment and integration with existing infrastructure. Secondary technical planning is required to ensure compliance with engineering standards and accessibility regulations.

  • Preparation of complete architectural design documentation for the bicycle path, including alignment, cross-sections, signage, and integration with the existing road infrastructure.

  • Technical planning for the bicycle path, including structural calculations, drainage solutions, accessibility compliance, and integration with existing road engineering standards.

How to take part

Who can apply

  • contractors must not be subject to exclusion under art. 108 ust. 1 ustawy Pzp or art. 7 ust. 1 of the Act on special solutions for counteracting support for aggression against Ukraine
  • submission of a declaration of non-exclusion (art. 125 ust. 1 ustawy Pzp)

What to submit

  • completed and signed offer form (załącznik nr 1 do SWZ)
  • declaration of non-exclusion (załącznik nr 2 do SWZ)
  • power of attorney (if applicable)
  • documents required for contractors outside Poland (as specified in SWZ)

Award criteria

  • Price (60% weight)
  • Professional qualifications and experience of the designated person (40% weight): must hold road engineering design qualifications and have completed 2-3 similar documentations (20 points) or 4+ (40 points) between 2022-2026

Tender documents

The visible document package includes three files. The PDF file ('01 ogłoszenie o zamówieniu.pdf') likely contains the official tender notice and procedural details. The two ZIP files ('Opis zakresu, koncepcja.zip' and 'SWZ i załączniki (f.oferty, ośw., wzór umowy) C-B.zip') appear to contain the project concept, technical requirements, and submission forms. The first ZIP likely includes plans, drawings, or technical descriptions for the bicycle path. The second ZIP probably contains the Specyfikacja Warunków Zamówienia (SWZ), offer forms, declarations, and a draft contract. The exact contents of the ZIP files cannot be confirmed without access, but their names suggest they cover design requirements and contractual conditions.

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej - budowa ścieżki rowerowej wzdłuż drogi krajowej 57 od przejazdu kolejowego w miejscowości Czerwonka do miejscowości Biesowo..

Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.