Tenders of Europe project card: Arlanda Airport Environmental and Stormwater Programme Consultancy, Stockholm Arlanda, Sweden
Featured in the daily edition, 16 Oct 2026

About the project

Consultancy services for the development of documents and plans related to environmental and stormwater management at Arlanda Airport, covering technical areas such as ground, water and sewage (VA), electrical (low voltage), hydrogeology, and geotechnics. The project includes all phases from needs analysis to final as-built documentation.

Why it matters

Arlanda Airport’s stormwater programme integrates multiple technical disciplines into a cohesive environmental strategy for a high-traffic hub.

Scope of work

Consultancy team required to deliver a full suite of documents for Arlanda Airport’s environmental and stormwater programme, including needs analysis, planning, design, and as-built documentation across ground, water and sewage (VA), electrical (low voltage), hydrogeology, and geotechnical disciplines. The team must consist of a senior project manager for ground, a senior project manager for VA, a project manager for electrical (low voltage), a hydrogeologist, and a geotechnical project manager.

Deliverables

  • needs analysis documents
  • planning and design documents
  • as-built (relationshandlingar) documentation

Required services

  • ground engineering consultancy
  • water and sewage (VA) engineering consultancy
  • electrical (low voltage) engineering consultancy
  • hydrogeology consultancy
  • geotechnical consultancy

Pelenoir assessment

The project is primarily an engineering and technical planning consultancy for Arlanda Airport's environmental and stormwater programme, covering ground, water and sewage (VA), electrical, hydrogeology, and geotechnical disciplines. Project and construction management is a secondary but necessary component for coordinating the consultancy team and ensuring delivery across all phases.

  • Technical engineering consultancy for ground, water and sewage (VA), electrical (low voltage), hydrogeology, and geotechnical disciplines, including needs analysis, planning, design, and as-built documentation for Arlanda Airport's environmental and stormwater programme.

  • Project management and coordination of the consultancy team, including senior project managers for ground, VA, and geotechnical disciplines, as well as overall delivery of the environmental and stormwater programme.

How to take part

Who can apply

  • use of European Single Procurement Document (ESPD) is optional but supported upon request
  • qualification criteria specified in procurement documents

What to submit

  • application documents as specified in the procurement files
  • optional ESPD document if requested

Tender documents

The visible document package includes five files, all requiring login for access. The files likely contain the application invitation, exclusion and qualification criteria, and draft versions of the administrative conditions, assignment description, and evaluation model for the consultancy services. The PDF files probably detail the technical and procedural requirements for the environmental and stormwater programme at Arlanda Airport. The CLIPS files may include structured forms or templates for submission. The exact content of the files cannot be confirmed without access, but the filenames suggest they cover the full scope of the procurement process.

Source

Published on e-Avrop. Original title: Konsultgrupp till Miljö- och dagvattenprogram Arlanda Airport.

Summary and assessment prepared by Pelenoir from the public notice (16 Oct 2026). The original notice and its documents are binding. Page updated 16 Oct 2026.