About the project

Framework agreement for multidisciplinary engineering and specialist services to support the Aramis CCS Project from pre-final investment decision (FID) phase through execution, commissioning, and steady-state operations. Services include engineering design, technical support, and project execution for carbon capture and storage infrastructure.

Scope of work

Framework agreement for multidisciplinary engineering and specialist services for the Aramis CCS Project, covering pre-FID phase, execution, commissioning, and steady-state operations. The Engineering Partner will support the Aramis Engineering Team with technical and project execution services, including remote and on-site work at the Rotterdam/The Hague area.

Deliverables

  • Multidisciplinary engineering services
  • Specialist technical support
  • Project execution and commissioning support

Required services

  • Engineering design
  • Technical consulting
  • Project management
  • Carbon capture and storage (CCS) infrastructure development

Pelenoir assessment

The Aramis Carbon Capture and Storage (CCS) Project is primarily an engineering-driven initiative focused on the development of industrial-scale CCS infrastructure. The project scope explicitly supports multidisciplinary engineering and technical planning, with secondary emphasis on project management and specialist consulting for execution and operational phases.

  • Engineering design, technical planning, and infrastructure development for carbon capture and storage (CCS) facilities, including structural, civil, and building-services engineering for industrial-scale CCS infrastructure.

  • Project execution, commissioning support, and project management services to ensure the delivery of the CCS infrastructure from pre-FID phase through steady-state operations.

  • Specialist technical support and advisory services for carbon capture and storage (CCS) infrastructure, including niche technical consulting for industrial facilities.

How to take part

Who can apply

  • Minimum of 3 and maximum of 5 candidates to be invited for the second stage of the procedure
  • Selection criteria as per procurement documents
  • Electronic submission required with advanced or qualified electronic signature or seal

What to submit

  • Refer to tender documents for detailed submission terms
  • Electronic submission allowed
  • Submission in English

Tender documents

The visible document package contains a single PDF file labeled 'Original notice.pdf'. This file likely includes the full tender notice, procurement terms, and contractual conditions for the Engineering Services Contract. It may also contain submission forms, eligibility criteria, and procedural guidelines for the competitive dialogue process. The exact contents beyond the visible label cannot be confirmed, as the file requires login for access. No additional file types or sizes are declared.

Source

Published on TenderNed. Original title: Engineering Services Contract.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 19 Sep 2026.