About the project

Restoration and revitalization of a moor ecosystem in Rossmoos, including clearing work, earthworks, and construction of barrier structures in two variants, as part of an EU-funded LIFE project.

Scope of work

Implementation of revitalization measures for a moor ecosystem, including clearing work, earthworks, and construction of two variants of barrier structures, as defined in the approved submission project dated 06.05.2026.

Deliverables

  • clearing work
  • earthworks
  • construction of barrier structures (two variants)

Pelenoir assessment

This project focuses on the restoration and revitalization of a moor ecosystem, primarily involving technical engineering work for earthworks and barrier structures, complemented by landscape architecture for ecological and environmental design interventions.

  • Technical planning and execution of earthworks, barrier structure design, and infrastructure required for moor ecosystem restoration, including structural and civil engineering solutions.

  • Design and integration of ecological restoration measures, including clearing work and landscape interventions to support the moor ecosystem revitalization.

How to take part

Who can apply

  • suitable for small and medium-sized enterprises (KMU)

What to submit

  • offers must be submitted in German
  • electronic submission required via the specified platform
  • electronic catalogue required

Award criteria

  • price (100% weighting)

Source

Published on Austrian Public Procurement Search. Original title: Life-Projekt AMooRe (Austrian Moor Restoration); Projektreferenznummer: 101104368-LIFE22- IPN_AT_LIFE AMooRe; WP-7; Projektstandort: Rossmoos.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 1 Oct 2026.