About the project

Framework agreement for general contractor services to build new apron, taxiways and associated airport technical infrastructure on the east side of Vienna Airport.

Scope of work

Framework agreement for general contractor services covering construction of new apron and taxiway areas, including all associated airport technical infrastructure on the east side of Vienna Airport. The contract is divided into phases, with a maximum of 100 participants allowed in the framework agreement. Variants are permitted, and electronic invoicing is allowed.

Deliverables

  • General contractor services for apron and taxiway construction
  • Associated airport technical infrastructure

Required services

Pelenoir assessment

This project primarily involves the construction and general contracting of new airport apron and taxiway infrastructure, with a secondary focus on the engineering and technical planning required for associated airport systems. The scope is dominated by physical construction activities, but engineering support is necessary for the integration of technical infrastructure.

  • Delivery of the physical construction of new apron and taxiway areas, including coordination and execution of all associated civil engineering works as the general contractor.

  • Technical planning and engineering for airport-specific infrastructure, including civil engineering and integration of airport technical systems (e.g., drainage, lighting, markings, and ground support equipment).

How to take part

Who can apply

  • Open to all economic operators (no reserved participation)
  • Maximum of 100 participants in the framework agreement
  • Procedure conducted in successive phases with possible exclusion of participants in each phase

What to submit

  • Submission in German
  • Electronic submission required

Source

Published on Austrian Public Procurement Search. Original title: RVB _GU D-6440 D-4990 D-7310 D-7980 Vorfeldentwicklung Ost.

Summary and assessment prepared by Pelenoir from the public notice (25 Nov 2026). The original notice and its documents are binding. Page updated 23 Nov 2026.