About the project

Replacement of ventilation systems and energy efficiency improvements at the Oslo School of Architecture and Design (AHO). The project requires separate consultants for client representation (BHO), health and safety coordination during design and execution (SHA-koordinator KP/KU), and technical client representation (TBHO).

Scope of work

Procurement of consulting services for client representation (BHO), health and safety coordination during design and execution (SHA-koordinator KP/KU), and technical client representation (TBHO) for the ventilation replacement and energy efficiency upgrade project at AHO. Separate individuals must be proposed for each role.

Deliverables

  • Consulting services for client representation (BHO)
  • Health and safety coordination during design and execution (SHA-koordinator KP/KU)
  • Technical client representation (TBHO)

Required services

  • client representation
  • health and safety coordination
  • technical consulting

Pelenoir assessment

The project scope is focused on procuring consulting services for client representation, technical oversight, and health and safety coordination during the design and execution phases of a ventilation and energy efficiency upgrade. This aligns exclusively with project and construction management activities, with no direct involvement of architectural design, engineering, or other AEC disciplines in the tendered services.

  • Client representation (BHO), technical client representation (TBHO), and health and safety coordination during design and execution (SHA-koordinator KP/KU) for the ventilation replacement and energy efficiency upgrade project.

How to take part

Who can apply

  • Satisfactory economic capacity (credit assessment may be conducted)
  • Relevant experience from similar projects (up to 3 reference projects from the last 3 years)
  • Sufficient manpower and capacity
  • Personnel with necessary qualifications in health, safety, and working environment (for SHA-koordinator roles)
  • Legally established enterprise

What to submit

  • Description of up to 3 reference projects (1 A4 page per project)
  • Overview of company employees by job category
  • Certificates and course diplomas for proposed personnel
  • Tender submitted in Norwegian

Award criteria

  • Price (40%)
  • Quality, competence, and experience of proposed personnel (60%)

Source

Published on Doffin. Original title: Prosjekt 1250901 AHO – Utskiftning ventilasjon og ENØK Byggherreombud (BHO), SHA-koordinator for prosjektering (KP) og SHA-koordinator for utførelse (KU) samt Teknisk Byggherreombud H 001.

Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.