Architecture · Service contract
AaltoAlvari Swimming Center Phase 4 Renovation
Renovation of the historic AaltoAlvari swimming center, including the original 1955 swimming hall, 1964 and 1975 extensions, 25-meter pool, spectator areas, changing rooms, saunas, technical spaces, water treatment facilities, and lobby areas.
- Deadline
- 14 days left to apply
- Location
- Jyväskylä, Central Finland, Finland
- Declared value
- EUR 400 000
About the project
Renovation of the historic AaltoAlvari swimming center, including the original 1955 swimming hall, 1964 and 1975 extensions, 25-meter pool, spectator areas, changing rooms, saunas, technical spaces, water treatment facilities, and lobby areas. The project aims to extend the building's technical lifespan, upgrade structures, spaces, building services systems, and water treatment systems while preserving the cultural heritage values of the UNESCO-listed site.
Scope of work
The procurement covers principal and architectural planning services for Phase 4 of the AaltoAlvari swimming center renovation. This includes conceptual planning (hankesuunnittelu), general and implementation planning, preparation of tender calculation materials, construction-phase planning, and post-construction warranty-period tasks. The planning must respect the building's UNESCO-listed heritage status and ensure minimal disruption to operations during construction.
Deliverables
- conceptual plans (hankesuunnittelu)
- general and implementation plans
- tender calculation materials
- construction-phase planning documents
- commissioning and warranty-period planning
Required services
- architectural planning
- structural engineering
- building services engineering
- water treatment system planning
- cost estimation and phase planning
Pelenoir assessment
The AaltoAlvari Swimming Center Phase 4 Renovation is primarily an architectural and design project focused on preserving the UNESCO-listed cultural heritage of the historic swimming center while upgrading its technical systems. The scope explicitly supports multiple AEC disciplines, with architectural planning as the dominant group, complemented by engineering, sustainability, and project management tasks to ensure a holistic renovation approach.
-
Architecture 50%
Architectural planning for the renovation of the AaltoAlvari swimming center, including conceptual design, general and implementation planning, and preservation of the UNESCO-listed cultural heritage values of the building.
-
Engineering 30%
Structural engineering, building services engineering (e.g., HVAC, electrical, plumbing), and water treatment system planning to upgrade the swimming center's technical systems and extend its lifespan.
-
Sustainability 10%
Assessment and integration of sustainability measures, energy efficiency upgrades, and building performance improvements to align with modern standards while preserving heritage values.
-
Cost estimation, phase planning, construction-phase coordination, and warranty-period tasks to ensure minimal disruption to operations during the renovation.
How to take part
Who can apply
- compliance with Finnish public procurement law (32014L0024)
- fulfillment of suitability and minimum requirements for tenderers and key personnel
- submission of European Single Procurement Document (ESPD)
What to submit
- tender offer compliant with request for tender and annexes
- European Single Procurement Document (ESPD)
Award criteria
- most economically advantageous tender based on price and quality criteria specified in the tender request
Source
Published on HILMA. Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, pää- ja arkkitehtisuunnittelu.
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



