---
title: "Zero-emission construction and logistics expertise for Gelderland"
url: "https://pelenoir.com/en/tenders-of-europe/projects/zero-emission-construction-and-logistics-expertise-for-gelderland-8949/"
id: 8949
country: "Netherlands"
city: "Arnhem"
region: "Gelderland"
client: "Provincie Gelderland"
type: "Service contract"
procedure: "Open procedure (openbaar)"
deadline: "2026-11-10"
status: "closed"
days_left: -18
status_as_of: "2026-11-28"
value: "EUR 750 000"
disciplines: ["Specialist consulting","Sustainability","Engineering"]
source: "TenderNed"
source_url: "https://www.tenderned.nl/aankondigingen/overzicht/442416"
updated: "2026-10-02"
publisher: "Pelenoir – Tenders of Europe"
---

# Zero-emission construction and logistics expertise for Gelderland

> [Framework agreement](https://pelenoir.com/en/tenders-of-europe/types/framework-agreements/) for expert [advisory services](https://pelenoir.com/en/tenders-of-europe/disciplines/consulting/) on zero-emission construction, maintenance, infrastructure, energy solutions, and public charging infrastructure development for public sector projects in the Veluwe region.

**Status (2026-11-28):** Closed 18 days ago — deadline 2026-11-10 12:00  
**Location:** Arnhem, Gelderland, Netherlands  
**Contracting authority:** Provincie Gelderland  
**Opportunity type:** Service contract — Open procedure (openbaar)  
**Declared value:** EUR 750 000  
**CPV:** 71300000 Engineering services; 79600000; 90713000  

## About the project

Framework agreement for expert advisory services on zero-emission construction, maintenance, infrastructure, energy solutions, and public charging infrastructure development for public sector projects in the Veluwe region.

## Scope of work

Expert advisory services for zero-emission construction, maintenance, infrastructure, energy solutions, and public charging infrastructure development. The framework agreement includes coordination, knowledge, and experience in zero-emission building, logistics, and connecting public and private stakeholders.

### Deliverables

- Expert advisory services on zero-emission construction and maintenance
- Solutions for energy infrastructure and net congestion
- Development of public charging locations
- Coordination and integration of public and private stakeholders

### Required services

- engineering consultancy
- environmental advisory services
- recruitment or staffing support for specialized roles

## Pelenoir assessment

This project is primarily a specialist consulting engagement focused on zero-emission construction and logistics expertise, with secondary involvement in [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and engineering disciplines. The scope emphasizes advisory services, stakeholder coordination, and the development of sustainable infrastructure solutions for public sector projects in the Veluwe region.

## How to take part

### Who can apply

- Open to all qualified service providers under EU procurement rules
- Submission of Uniform European Procurement Document (UEA) required
- Compliance with exclusion grounds as per tender documents

### What to submit

- Electronic submission allowed
- Submission in Dutch language only
- Validity of tender for 30 days post-submission

### Award criteria

- Quality (70%): Coordination, approach, and vision (30%); Knowledge and experience of experts (20%); Interview (20%)
- Price (30%): Weighted hourly rate

## Tender documents

The visible document package includes one PDF file labeled 'Original notice.pdf'. This file likely contains the full tender notice, including detailed procurement conditions, scope of work, submission requirements, and evaluation criteria. The document is expected to outline the legal and procedural framework for the framework agreement, as well as specific terms related to zero-emission construction and logistics expertise. However, the exact contents beyond the tender notice cannot be confirmed without access to the file.

## Disciplines

- **Specialist consulting** (primary, 60%): Expert advisory services on zero-emission construction, maintenance, infrastructure, energy solutions, and public charging infrastructure development, including stakeholder coordination and knowledge integration.
- **Sustainability** (secondary, 30%): Development and implementation of zero-emission building strategies, energy solutions, and sustainability measures for public infrastructure projects.
- **Engineering** (secondary, 10%): Technical planning and engineering consultancy for infrastructure and energy solutions, including addressing net congestion issues.

## Related projects

- [Spoorzone HLMR Environmental Impact Assessment](https://pelenoir.com/en/tenders-of-europe/projects/spoorzone-hlmr-environmental-impact-assessment-19022/) — Hoofddorp, Netherlands · Service contract · deadline 2027-01-08 (41 days left to apply)
- [Energy Transition Advisory Services for 's-Hertogenbosch](https://pelenoir.com/en/tenders-of-europe/projects/energy-transition-advisory-services-for-s-hertogenbosch-18408/) — 's-Hertogenbosch, Netherlands · Service contract · deadline 2027-01-22 (55 days left to apply)
- [Rotterdam Independent Safety Assessor for Transport System](https://pelenoir.com/en/tenders-of-europe/projects/rotterdam-independent-safety-assessor-for-transport-system-18410/) — Rotterdam, Netherlands · Service contract · deadline 2027-02-01 (65 days left to apply)
- [PFAS contamination source investigation across West Holland](https://pelenoir.com/en/tenders-of-europe/projects/pfas-contamination-source-investigation-across-west-holland-20166/) — Netherlands · Service contract · deadline 2027-01-20 (53 days left to apply)
- [DMI Ecosystem Research and Development Services](https://pelenoir.com/en/tenders-of-europe/projects/dmi-ecosystem-research-and-development-services-15447/) — Amersfoort, Netherlands · Service contract · deadline 2027-01-20 (53 days left to apply)
- [Town hall interior renovation: contemporary redesign within a listed monument](https://pelenoir.com/en/tenders-of-europe/projects/town-hall-interior-renovation-contemporary-redesign-within-a-listed-20541/) — Venlo, Netherlands · Service contract · deadline 2026-12-22 (24 days left to apply)

## Source

Original notice on TenderNed: https://www.tenderned.nl/aankondigingen/overzicht/442416  
Original title: ROK experts emissieloos bouwen en (bouw)logistiek op de Veluwe

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/zero-emission-construction-and-logistics-expertise-for-gelderland-8949/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
