---
title: "Vargfors Power Line Relocation L5S1/L5S2"
url: "https://pelenoir.com/en/tenders-of-europe/projects/vargfors-power-line-relocation-l5s1-l5s2-15928/"
id: 15928
country: "Sweden"
city: "Skellefteå"
region: "Västerbottens län"
client: "Skellefteå Kraft AB"
type: "Service contract"
procedure: "National one-step procedure (LUF)"
deadline: "2026-11-23"
status: "closed"
days_left: -5
status_as_of: "2026-11-28"
value: "SEK 600 000 (≈ EUR 53 471)"
disciplines: ["Engineering","Project and construction management"]
source: "e-Avrop"
source_url: "https://www.e-avrop.com/skekraft/e-Upphandling/Announcement.aspx?id=74786"
updated: "2026-10-23"
publisher: "Pelenoir – Tenders of Europe"
---

# Vargfors Power Line Relocation L5S1/L5S2

> Relocation and redesign of two 170 kV power lines (L5S1 and L5S2) over approximately 1.4 km in Vargfors, Norsjö Municipality, to connect to the new Malånäset main grid station and Vattenfall's new PT80 station.

**Status (2026-11-28):** Closed 5 days ago — deadline 2026-11-23  
**Location:** Skellefteå, Västerbottens län, Sweden  
**Contracting authority:** Skellefteå Kraft AB  
**Opportunity type:** Service contract — National one-step procedure (LUF)  
**Declared value:** SEK 600 000 (≈ EUR 53 471)  
**CPV:** 71323100; 71300000 Engineering services; 71320000 Engineering design services; 71324000 Quantity surveying services; 71323200  

## About the project

Relocation and redesign of two 170 kV power lines (L5S1 and L5S2) over approximately 1.4 km in Vargfors, Norsjö Municipality, to connect to the new Malånäset main grid station and Vattenfall's new PT80 station. The project includes design services with an option for preparing tender documents for the execution contract.

## Scope of work

Design services for the relocation of two 170 kV power lines (L5S1 and L5S2) over approximately 1.4 km, including preparation of construction documents. The contract includes an option for creating tender documents for the execution contract. The work is to be performed on a running account basis against a budget price.

### Deliverables

- Design documentation for power line relocation
- Construction documents (optional)

### Required services

- Electrical [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- Technical construction services for power lines
- Preparation of tender documents for execution contract (optional)

## Pelenoir assessment

This project primarily involves the relocation and redesign of high-voltage power lines, requiring detailed electrical and technical engineering planning. A secondary aspect includes the preparation of tender documents for the execution phase, indicating a minor [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) component.

## How to take part

### What to submit

- Tender with estimated budget price for main assignment and option
- Compliance with supplier code of conduct
- Signed confidentiality agreement

### Award criteria

- Quality

## Tender documents

The visible document package includes standard procurement forms and templates, such as a supplier code of conduct, confidentiality agreement templates, and invoicing instructions. The file '14.6 FFU projektering Ledningsflytt Vargfors L5S1L5S2 rev A.pdf' likely contains the main tender documents (FFU) for the design services, including technical specifications and submission requirements. The 'Avtal UH-2026-401' file appears to be a draft contract for the power line relocation project. The 'Skakrav.pdf' and 'Utvärderingsmodell.pdf' files probably outline technical requirements and the evaluation criteria for tender submissions, respectively. The exact content of these files cannot be confirmed without access, as the documents require login.

## Disciplines

- **Engineering** (primary, 90%): Electrical engineering design and technical planning for the relocation of two 170 kV power lines, including structural and civil engineering aspects of the infrastructure.
- **Project and construction management** (secondary, 10%): Preparation of tender documents for the execution contract (optional) and coordination of the design process against a budget price.

## Related projects

- [Road management system and infrastructure inventory for Gotland](https://pelenoir.com/en/tenders-of-europe/projects/road-management-system-and-infrastructure-inventory-for-gotland-19057/) — Visby, Sweden · Service contract · deadline 2026-12-10 (12 days left to apply)
- [Technical Consulting for HVAC, Control and Monitoring Systems](https://pelenoir.com/en/tenders-of-europe/projects/technical-consulting-for-hvac-control-and-monitoring-systems-16899/) — Eslöv, Sweden · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Dalens Hospital Structural and Geotechnical Engineering Consultancy](https://pelenoir.com/en/tenders-of-europe/projects/dalens-hospital-structural-and-geotechnical-engineering-consultancy-15799/) — Stockholm, Sweden · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Technical consultancy for building design, project management and inspections](https://pelenoir.com/en/tenders-of-europe/projects/technical-consultancy-for-building-design-project-management-and-19385/) — Sweden · Service contract · deadline 2026-12-17 (19 days left to apply)
- [Dalens Hospital MEP and Fire Protection Design Consultancy](https://pelenoir.com/en/tenders-of-europe/projects/dalens-hospital-mep-and-fire-protection-design-consultancy-15798/) — Stockholm, Sweden · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Wastewater sludge dewatering: engineering design for treatment plant upgrade](https://pelenoir.com/en/tenders-of-europe/projects/wastewater-sludge-dewatering-engineering-design-for-treatment-plant-19591/) — Motala, Sweden · Service contract · deadline 2026-12-01 (3 days left to apply)

## Source

Original notice on e-Avrop: https://www.e-avrop.com/skekraft/e-Upphandling/Announcement.aspx?id=74786  
Original title: Projektering Ledningsflytt Vargfors L5S1/L5S2

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/vargfors-power-line-relocation-l5s1-l5s2-15928/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
