---
title: "University building thermal upgrade: facade, roof and windows for energy efficiency"
url: "https://pelenoir.com/en/tenders-of-europe/projects/university-building-thermal-upgrade-facade-roof-and-windows-for-19580/"
id: 19580
country: "Poland"
city: "Szczecin"
region: "West Pomerania"
client: "ZACHODNIOPOMORSKI UNIWERSYTET TECHNOLOGICZNY W SZCZECINIE"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-11-24"
status: "closed"
days_left: -5
status_as_of: "2026-11-29"
disciplines: ["Architecture","Engineering","Sustainability"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df43ea-2d56-f907-c1c5-d5000194349d"
updated: "2026-11-16"
publisher: "Pelenoir – Tenders of Europe"
---

# University building thermal upgrade: facade, roof and windows for energy efficiency

> Design and cost documentation for the thermal modernisation of the Electrical Faculty building at West Pomeranian University of Technology in Szczecin.

**Status (2026-11-29):** Closed 5 days ago — deadline 2026-11-24 10:00  
**Location:** Szczecin, West Pomerania, Poland  
**Contracting authority:** ZACHODNIOPOMORSKI UNIWERSYTET TECHNOLOGICZNY W SZCZECINIE  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 ustawy)  
**CPV:** 71200000 Architectural and related services; 71220000 Architectural design services; 71320000 Engineering design services; 71248000 Supervision of project and documentation; 71242000 Project and design preparation, estimation of costs  

## About the project

Design and cost documentation for the thermal modernisation of the Electrical Faculty building at West Pomeranian University of Technology in Szczecin. The project includes insulation of walls, roofs and flat roofs, replacement of windows and doors, modernisation of heating, hot water and lighting installations, and preparation for a future BMS system. The work is divided into two lots: Lot 1 covers building envelope upgrades, and Lot 2 covers technical installations and smart building infrastructure.

## Scope of work

The contract covers the preparation of full design and cost documentation for the thermal modernisation of the Electrical Faculty building. This includes architectural and [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/), cost estimation, author's supervision, and support during subsequent construction procurement. The work is divided into two lots: Lot 1 focuses on building envelope upgrades (insulation, windows, doors), and Lot 2 covers technical installations (heating, hot water, lighting, BMS infrastructure).

### Deliverables

- Design documentation (building permit and execution designs)
- Cost estimates and bills of quantities
- Author's supervision during construction
- Technical and procedural support for subsequent construction procurement
- Transfer of copyright for design outputs

### Required services

- [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/)
- engineering design (structural, mechanical, electrical)
- cost estimation and budgeting
- author's supervision
- technical support for construction procurement

## Pelenoir assessment

The project is a thermal modernisation of a university building, primarily involving architectural and engineering design for building envelope upgrades and technical installations. The scope explicitly supports ARCHITECTURE_AND_DESIGN for facade, roof, and window design, ENGINEERING_AND_TECHNICAL_PLANNING for heating, lighting, and BMS systems, and SUSTAINABILITY_AND_BUILDING_PERFORMANCE for [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) improvements.

## How to take part

### Who can apply

- Two completed architectural design services for building modernisation or refurbishment projects requiring a building permit, completed within the last three years
- For Lot 1: at least one service must include facade insulation and window replacement
- For Lot 2: at least one service must include electrical, lighting, heating, and telecommunication installations
- Each service must have a net value of at least PLN 50,000
- Consortium or third-party resources allowed under Polish public procurement law (PZP)

### What to submit

- Completed offer form (Załącznik nr 5 SWZ)
- Contractor's statement (Załącznik nr 3 SWZ)
- Third-party statements if applicable (Załącznik nr 3A SWZ)
- List of completed services (Załącznik nr 4 SWZ)
- Company registration documents (KRS, CEIDG or equivalent)
- Power of attorney for representatives if required
- Translations of non-Polish documents

### Award criteria

- Price (60% weight)
- Warranty period (20% weight)
- Contractual penalty amount (20% weight)

## Tender documents

The visible document package includes the main tender specification (SWZ) in PDF format, two ZIP archives containing detailed project descriptions and technical annexes for each lot, and several DOC and PDF files for submission forms, contractor statements, and draft contracts. The ZIP files for Lot 1 and Lot 2 likely contain architectural and engineering drawings, conservation recommendations, energy audit reports, and technical schematics for insulation, window replacement, and building systems modernisation. The PDF contracts outline terms for each lot, while the DOC files provide templates for required statements and service lists. The exact content of the ZIP archives cannot be confirmed without download, but their filenames suggest they include supporting technical and regulatory documents.

## Disciplines

- **Architecture** (primary, 40%): Architectural design for the thermal modernisation of the building envelope, including facade insulation, roof insulation, and replacement of windows and doors. Preparation of building permit and execution designs for the envelope upgrades.
- **Engineering** (secondary, 40%): Engineering design for the modernisation of heating, hot water, lighting, and BMS infrastructure, including structural, mechanical, and electrical systems. Preparation of technical documentation for installation upgrades.
- **Sustainability** (secondary, 20%): Energy efficiency improvements, thermal performance optimisation, and integration of smart building systems (BMS) to enhance the building's sustainability and operational efficiency.

## Related projects

- [Sports pitch modernisation and new changing rooms with sanitary facilities](https://pelenoir.com/en/tenders-of-europe/projects/sports-pitch-modernisation-and-new-changing-rooms-with-sanitary-19767/) — Rybnik, Poland · Service contract · deadline 2026-11-25 (closed 4 days ago)
- [Village hall modernisation: new insulated floor and ceramic tiles](https://pelenoir.com/en/tenders-of-europe/projects/village-hall-modernisation-new-insulated-floor-and-ceramic-tiles-20423/) — Juchnowiec Kościelny, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Playground and outdoor gym design: two public space projects for a small town](https://pelenoir.com/en/tenders-of-europe/projects/playground-and-outdoor-gym-design-two-public-space-projects-for-a-20821/) — Skępe, Poland · Service contract · deadline 2026-12-01 (2 days left to apply)
- [Multi-family housing complex: design and cost documentation for stage II](https://pelenoir.com/en/tenders-of-europe/projects/multi-family-housing-complex-design-and-cost-documentation-for-stage-19766/) — Brodnica, Poland · Service contract · deadline 2026-11-25 (closed 4 days ago)
- [Ski jumps HS20 and HS37: design for year-round training hills with shared landing](https://pelenoir.com/en/tenders-of-europe/projects/ski-jumps-hs20-and-hs37-design-for-year-round-training-hills-with-20674/) — Iwonicz-Zdrój, Poland · Service contract · deadline 2026-12-02 (3 days left to apply)
- [Self-service adventure park: design for a 200-metre aerial trail in a pine grove](https://pelenoir.com/en/tenders-of-europe/projects/self-service-adventure-park-design-for-a-200-metre-aerial-trail-in-a-19764/) — Polkowice, Poland · Service contract · deadline 2026-11-25 (closed 4 days ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df43ea-2d56-f907-c1c5-d5000194349d  
Original title: Wykonanie dokumentacji projektowej i kosztorysowej do realizacji zadania inwestycyjnego pn. „Termomodernizacja budynku Wydziału Elektrycznego przy ul. Sikorskiego 37 w Szczecinie”.

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/university-building-thermal-upgrade-facade-roof-and-windows-for-19580/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
