---
title: "ULB Collective Palace Technical Control Services"
url: "https://pelenoir.com/en/tenders-of-europe/projects/ulb-collective-palace-technical-control-services-19047/"
id: 19047
country: "Belgium"
city: "Brussels"
region: "Brussels-Capital Region"
client: "Université Libre de Bruxelles"
type: "Service contract"
procedure: "open procedure (procédure ouverte)"
deadline: "2026-12-11"
status: "open"
days_left: 13
status_as_of: "2026-11-28"
value: "EUR 17.5 m"
disciplines: ["Engineering","Project and construction management"]
source: "Belgian e-Procurement"
source_url: "https://www.publicprocurement.be/publication-workspaces/023bc908-b015-46c7-b986-7eb0fa5cefb8/general"
updated: "2026-11-12"
publisher: "Pelenoir – Tenders of Europe"
---

# ULB Collective Palace Technical Control Services

> Technical control for ULB Collective Palace means ensuring structural and fire safety during design and construction.

**Status (2026-11-28):** 13 days left to apply — deadline 2026-12-11 11:00  
**Location:** Brussels, Brussels-Capital Region, Belgium  
**Contracting authority:** Université Libre de Bruxelles  
**Opportunity type:** Service contract — open procedure (procédure ouverte)  
**Declared value:** EUR 17.5 m  
**CPV:** 71000000 Architectural, construction, engineering and inspection services; 71631300  

## About the project

Appointment of a technical control bureau for structural and fire safety control services during the design and construction of the ULB Collective Palace, a multi-phase university building project on the Plaine campus in Brussels. The project includes three phases: Phase 1 (6,000 m²) with auditoriums, multipurpose spaces, and research hub; Phase 2 (optional) with research greenhouse and [architecture](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) workshops; and Phase 3 (undefined) as a future expansion reserve.

## Why it matters

Technical control for ULB Collective Palace ensures structural and fire safety compliance during design and construction.

## Scope of work

The technical control bureau is required to support the contracting authority during the analysis of design-build tenders and to perform technical control services for structural stability, fire safety (passive and active), and building envelope (windows, curtain walls, waterproofing) during both the design and construction phases. The mission covers Phase 1 and optionally Phase 2 of the Collective Palace project, ensuring compliance with Belgian building codes and enabling the subscription of a decennial liability insurance policy.

### Deliverables

- Technical control methodology note (max 4 A4 pages)
- Curriculum vitae and reference lists for the senior engineer, site controller, and domain specialists
- Detailed mission reports and site visit logs
- Final technical control report enabling decennial insurance subscription

### Required services

- structural stability control
- fire safety control (passive and active, including sprinklers)
- building envelope control (windows, curtain walls, waterproofing)
- [site supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) and progress reporting
- compliance verification for building permits and insurance requirements

## Pelenoir assessment

The project is primarily focused on technical control services for structural and fire safety engineering, with a secondary component of project and construction management to ensure compliance and supervision during the design-build process of a university building.

## How to take part

### Who can apply

- Financial health certification by an independent auditor or chartered accountant (max 6 months old)
- Permanent control structure operating in [Belgium](https://pelenoir.com/en/tenders-of-europe/countries/belgium/) for at least 10 years
- Accreditation by at least five insurance companies for decennial liability coverage in Belgium
- Compliance with exclusion grounds under Belgian public procurement law (Articles 67-69 of the 2016 law)
- Submission of a European Single Procurement Document (ESPD)

### What to submit

- Completed ESPD form (ESPD_request_FR.pdf)
- Methodology note (max 4 A4 pages)
- Curriculum vitae for senior engineer and site controller
- List of significant missions for senior engineer and site controller (last 6 years)
- Curriculum vitae and reference lists for domain specialists
- Financial health attestation (max 6 months old)
- Insurance accreditation proof from at least five companies

### Award criteria

- Price (40%): evaluated using a proportional scoring formula based on the lowest bid
- Team composition (30%): seniority, experience in design-build projects, and relevance of references
- Methodology (30%): clarity, feasibility, and adaptability to tight project deadlines

## Tender documents

The visible document package includes two PDF files: an ESPD request form in French (ESPD_request_FR.pdf) and its corresponding versioned file (espd-request-3a2cd63f-6b05-4e95-ab4f-2e4bfde0e2a4-fr.pdf). These files likely contain the European Single Procurement Document template required for submission, including sections on exclusion grounds, selection criteria, and self-declarations. The absence of additional files suggests that detailed technical annexes, plans, or drawings may be accessible only after registration or login. The exact content of the ESPD form is known, but the presence of other project-specific documents cannot be confirmed from the visible context.

## Disciplines

- **Engineering** (primary, 80%): Technical control services for structural stability, fire safety (passive and active), and building envelope compliance during both design and construction phases of the university building project.
- **Project and construction management** (secondary, 20%): Supporting the contracting authority during the analysis of design-build tenders, site supervision, progress reporting, and compliance verification for building permits and insurance requirements.

## Related projects

- [Wastewater sludge incineration and drying plant study in Wallonia](https://pelenoir.com/en/tenders-of-europe/projects/wastewater-sludge-incineration-and-drying-plant-study-in-wallonia-19188/) — Thumaide, Belgium · Service contract · deadline 2027-01-05 (38 days left to apply)
- [R8 Kortrijk-Kuurne-Harelbeke Redevelopment Framework Agreement](https://pelenoir.com/en/tenders-of-europe/projects/r8-kortrijk-kuurne-harelbeke-redevelopment-framework-agreement-18693/) — Kortrijk, Kuurne, Harelbeke, Belgium · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Stability engineering and architecture for historic church](https://pelenoir.com/en/tenders-of-europe/projects/stability-engineering-and-architecture-for-historic-church-19335/) — Fontaine-l'Évêque, Belgium · Service contract · deadline 2026-12-01 (3 days left to apply)
- [N34 Albert I laan redevelopment phase 2](https://pelenoir.com/en/tenders-of-europe/projects/n34-albert-i-laan-redevelopment-phase-2-16176/) — Nieuwpoort, Belgium · Service contract · deadline 2026-12-01 (3 days left to apply)
- [N54 Lobbes-Erquelinnes Missing Link Road Studies](https://pelenoir.com/en/tenders-of-europe/projects/n54-lobbes-erquelinnes-missing-link-road-studies-18246/) — Lobbes, Belgium · Service contract · deadline 2026-12-08 (10 days left to apply)
- [Waste2Emissions CO₂ capture and conditioning feasibility study](https://pelenoir.com/en/tenders-of-europe/projects/waste2emissions-co2-capture-and-conditioning-feasibility-study-18118/) — Thumaide, Belgium · Study · deadline 2026-11-30 (2 days left to apply)

## Source

Original notice on Belgian e-Procurement: https://www.publicprocurement.be/publication-workspaces/023bc908-b015-46c7-b986-7eb0fa5cefb8/general  
Original title: Désignation d'un bureau de contrôle pour une mission de contrôle technique portant sur le gros-oeuvre fermé et la sécurité incendie

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/ulb-collective-palace-technical-control-services-19047/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
