---
title: "Technical and economic analysis for new biogas plant at GOŚ ŁAM"
url: "https://pelenoir.com/en/tenders-of-europe/projects/technical-and-economic-analysis-for-new-biogas-plant-at-gos-lam-13159/"
id: 13159
country: "Poland"
city: "Łódź"
region: "Łódzkie"
client: "\"ZAKŁAD WODOCIĄGÓW I KANALIZACJI\" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-10-16"
status: "closed"
days_left: -43
status_as_of: "2026-11-28"
disciplines: ["Specialist consulting","Sustainability"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df24a1-7b13-6e6e-647d-de00019d839c"
updated: "2026-10-07"
publisher: "Pelenoir – Tenders of Europe"
---

# Technical and economic analysis for new biogas plant at GOŚ ŁAM

> Consultancy service to conduct a technical and economic analysis for the construction of a new biogas plant at the GOŚ ŁAM site, including the presentation of an optimal implementation variant based on the provided concept document.

**Status (2026-11-28):** Closed 43 days ago — deadline 2026-10-16 08:00  
**Location:** Łódź, Łódzkie, Poland  
**Contracting authority:** "ZAKŁAD WODOCIĄGÓW I KANALIZACJI" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**CPV:** 71241000 Feasibility study, advisory service, analysis; 71242000 Project and design preparation, estimation of costs; 79314000  

## About the project

Consultancy service to conduct a technical and economic analysis for the construction of a new biogas plant at the GOŚ ŁAM site, including the presentation of an optimal implementation variant based on the provided concept document.

## Scope of work

Consultancy service to perform a technical and economic analysis for the construction of a new biogas plant, including risk assessment and presentation of the optimal implementation variant based on the provided concept document (Koncepcja Instalacji fermentacji metanowej w miejscowości Pabianice).

### Deliverables

- Technical and economic analysis report
- Risk assessment for the biogas plant project
- Optimal implementation variant for the biogas plant construction

### Required services

- feasibility studies
- technical consultancy
- economic analysis
- project preparation and cost estimation
- executability analysis

## Pelenoir assessment

The project involves a consultancy service for conducting a technical and economic analysis of a new biogas plant, focusing on feasibility, risk assessment, and optimal implementation. The primary AEC business group is specialist consulting, with secondary relevance to [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and building performance due to the [renewable energy](https://pelenoir.com/en/tenders-of-europe/typologies/energy-and-utilities/) focus of the project.

## How to take part

### Who can apply

- Contractor must demonstrate experience in conducting at least three economic analyses (with risk assessments) for renewable energy projects (minimum 1.5 MWe capacity) within the last five years, including at least two analyses specifically for biogas plants (minimum 1.5 MWe capacity).
- Contractor may not use the same project/installation to fulfill multiple experience requirements.

### What to submit

- Offers must be submitted electronically via the designated procurement platform.
- Documents must be prepared in Polish.
- Required documents include a list of services performed in the last five years to demonstrate eligibility.

### Award criteria

- Price (100% weight)

## Disciplines

- **Specialist consulting** (primary, 80%): Conducting technical and economic analysis, feasibility studies, risk assessment, and presenting the optimal implementation variant for the biogas plant project.
- **Sustainability** (secondary, 20%): Assessing sustainability aspects, energy performance, and renewable energy integration for the biogas plant project.

## Related projects

- [Spoorzone HLMR Environmental Impact Assessment](https://pelenoir.com/en/tenders-of-europe/projects/spoorzone-hlmr-environmental-impact-assessment-19022/) — Hoofddorp, Netherlands · Service contract · deadline 2027-01-08 (41 days left to apply)
- [PFAS contamination source investigation across West Holland](https://pelenoir.com/en/tenders-of-europe/projects/pfas-contamination-source-investigation-across-west-holland-20166/) — Netherlands · Service contract · deadline 2027-01-20 (53 days left to apply)
- [Public square redesign: climate-adaptive landscape for blood donors](https://pelenoir.com/en/tenders-of-europe/projects/public-square-redesign-climate-adaptive-landscape-for-blood-donors-20670/) — Polkowice, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Energy Transition Advisory Services for 's-Hertogenbosch](https://pelenoir.com/en/tenders-of-europe/projects/energy-transition-advisory-services-for-s-hertogenbosch-18408/) — 's-Hertogenbosch, Netherlands · Service contract · deadline 2027-01-22 (55 days left to apply)
- [Bytom Strategic Noise Map Update (2nd Edition)](https://pelenoir.com/en/tenders-of-europe/projects/bytom-strategic-noise-map-update-2nd-edition-15296/) — Bytom, Poland · Service contract · deadline 2026-10-27 (closed 32 days ago)
- [DMI Ecosystem Research and Development Services](https://pelenoir.com/en/tenders-of-europe/projects/dmi-ecosystem-research-and-development-services-15447/) — Amersfoort, Netherlands · Service contract · deadline 2027-01-20 (53 days left to apply)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df24a1-7b13-6e6e-647d-de00019d839c  
Original title: Przeprowadzenie analizy techniczno-ekonomicznej przedsięwzięcia polegającego na budowie nowej biogazowni na terenie GOŚ ŁAM

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/technical-and-economic-analysis-for-new-biogas-plant-at-gos-lam-13159/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
