---
title: "Szamotuły Ring Road Construction Supervision"
url: "https://pelenoir.com/en/tenders-of-europe/projects/szamotuly-ring-road-construction-supervision-17667/"
id: 17667
country: "Poland"
city: "Szamotuły"
region: "Wielkopolskie"
client: "WIELKOPOLSKI ZARZĄD DRÓG WOJEWÓDZKICH W POZNANIU"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 ustawy)"
deadline: "2026-11-13"
status: "closed"
days_left: -15
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df3a6e-c2db-99ac-e2d6-6b000120ed12"
updated: "2026-11-04"
publisher: "Pelenoir – Tenders of Europe"
---

# Szamotuły Ring Road Construction Supervision

> Comprehensive investor supervision services for the construction of the Szamotuły ring road along provincial roads 184 and 187, including road and [bridge](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) works.

**Status (2026-11-28):** Closed 15 days ago — deadline 2026-11-13 12:00  
**Location:** Szamotuły, Wielkopolskie, Poland  
**Contracting authority:** WIELKOPOLSKI ZARZĄD DRÓG WOJEWÓDZKICH W POZNANIU  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 ustawy)  
**CPV:** 71247000 Supervision of building work  

## About the project

Comprehensive investor supervision services for the construction of the Szamotuły ring road along provincial roads 184 and 187, including road and bridge works.

## Scope of work

Comprehensive investor supervision for the construction of the Szamotuły ring road, including oversight of road and bridge works, compliance with technical specifications, and coordination of construction activities.

### Deliverables

- Supervision of road construction and bridge works
- Compliance verification with technical and legal requirements
- Coordination of construction activities

### Required services

- [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/)
- technical oversight
- quality control

## Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it involves comprehensive investor supervision for the construction of a ring road, including oversight of road and bridge works, compliance verification, and coordination of construction activities. No other AEC business groups are explicitly supported by the extracted scope.

## How to take part

### Who can apply

- Execution of at least one road construction supervision project valued at ≥ PLN 40,000,000 gross in the last 10 years
- Execution of at least two bridge construction supervision projects, including one over an active [railway](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/) line, in the last 10 years
- Designation of at least one road works supervisor and one bridge works supervisor with specified experience

### What to submit

- Electronic submission via the designated procurement platform
- Documents in Polish
- Proof of eligibility and experience
- Bid bond of PLN 4,200

### Award criteria

- Price (60%)
- Warranty period (20%)
- Staff potential (ID) (10%)
- Staff potential (IM) (10%)

## Disciplines

- **Project and construction management** (primary, 100%): Comprehensive investor supervision for the construction of the Szamotuły ring road, including oversight of road and bridge works, compliance verification with technical and legal requirements, and coordination of construction activities.

## Related projects

- [Sanitary sewer network: 1 km new gravity pipeline for Strzyżów](https://pelenoir.com/en/tenders-of-europe/projects/sanitary-sewer-network-1-km-new-gravity-pipeline-for-strzyzow-20207/) — Strzyżów, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Stormwater retention basins: flood resilience upgrade for Radom](https://pelenoir.com/en/tenders-of-europe/projects/stormwater-retention-basins-flood-resilience-upgrade-for-radom-19753/) — Radom, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Heritage building conversion: potato storage turned into conservation workshops and education spaces](https://pelenoir.com/en/tenders-of-europe/projects/heritage-building-conversion-potato-storage-turned-into-conservation-20228/) — Oświęcim, Poland · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Road junction expansion: investor supervision for national road upgrade near Korzeniste](https://pelenoir.com/en/tenders-of-europe/projects/road-junction-expansion-investor-supervision-for-national-road-19353/) — Korzeniste, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Building supervision: roof repair, ventilation removal and bike shelter for a public office](https://pelenoir.com/en/tenders-of-europe/projects/building-supervision-roof-repair-ventilation-removal-and-bike-shelter-20820/) — Poznań, Poland · Service contract · deadline 2026-12-03 (5 days left to apply)
- [Modernisation of two heritage buildings into an art gallery and cultural centre](https://pelenoir.com/en/tenders-of-europe/projects/modernisation-of-two-heritage-buildings-into-an-art-gallery-and-19954/) — Zielona Góra, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df3a6e-c2db-99ac-e2d6-6b000120ed12  
Original title: Pełnienie kompleksowego nadzoru inwestorskiego dla zadania: Budowa obwodnicy Szamotuł w ciągu dróg wojewódzkich nr 184 i 187

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/szamotuly-ring-road-construction-supervision-17667/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
