---
title: "Stormwater collector construction supervision in Leszno"
url: "https://pelenoir.com/en/tenders-of-europe/projects/stormwater-collector-construction-supervision-in-leszno-14120/"
id: 14120
country: "Poland"
city: "Leszno"
region: "Wielkopolskie"
client: "Miasto Leszno"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)"
deadline: "2026-10-19"
status: "closed"
days_left: -40
status_as_of: "2026-11-28"
value: "PLN 247 365 (≈ EUR 55 464)"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df2602-ebaf-9344-5997-b20001063e96"
updated: "2026-10-09"
publisher: "Pelenoir – Tenders of Europe"
---

# Stormwater collector construction supervision in Leszno

> Leszno’s stormwater collectors will only work if the supervision team catches the small mistakes before the next downpour.

**Status (2026-11-28):** Closed 40 days ago — deadline 2026-10-19 10:00  
**Location:** Leszno, Wielkopolskie, Poland  
**Contracting authority:** Miasto Leszno  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 2 of the Polish Public Procurement Law)  
**Declared value:** PLN 247 365 (≈ EUR 55 464)  
**CPV:** 71520000 Construction supervision services; 71540000 Construction management services; 71247000 Supervision of building work  

## About the project

Supervision of [construction works](https://pelenoir.com/en/tenders-of-europe/disciplines/construction/) for two stormwater collector projects: Part I - construction of the Gronowo stormwater collector, and Part II - reconstruction of the stormwater collector along Kordeckiego Street, including related infrastructure adjustments and surface restorations.

## Why it matters

Stormwater collectors are invisible until they fail. The supervision team’s attention to detail will determine whether residents notice the difference when the next downpour arrives.

## Scope of work

Supervision of construction works for two stormwater collector projects: Part I involves construction of a new stormwater collector in Gronowo (design-build formula), including stormwater drainage network, utility relocations, and surface restorations. Part II involves reconstruction of the existing stormwater collector along Kordeckiego Street, including utility adjustments, surface restorations, and connection to the Gronowo collector.

### Deliverables

- [Construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) services for stormwater collector projects
- Inspection of design and construction works for Part I (Gronowo collector)
- Inspection of reconstruction works for Part II (Kordeckiego Street collector)
- Compliance verification with project documentation and legal requirements

### Required services

- Construction supervision (inspector nadzoru inwestorskiego)
- Project management (usługi zarządzania budową)
- Site inspection and quality control (nadzór nad robotami budowlanymi)

## Pelenoir assessment

The project involves the procurement of construction supervision and project management services for two stormwater collector infrastructure works in Leszno. The scope is exclusively focused on oversight, compliance verification, and quality control during construction, with no design, engineering, or physical construction activities included.

## How to take part

### Who can apply

- Minimum 5 years of experience as a construction supervision inspector for stormwater or sanitary collectors (minimum Ø500mm, 400m length for Part I; Ø300mm, 200m length for Part II)
- Valid construction supervision licenses for sanitary and road engineering works
- Experience in road surface restoration and utility relocation projects
- Compliance with Polish Public Procurement Law (art. 109, 125)

### What to submit

- Signed offer form (Załącznik nr 1 do SWZ)
- Documentation of professional qualifications and experience for supervision personnel
- List of completed similar projects (Załącznik nr 5 do SWZ)
- Declaration of compliance with exclusion criteria (Załącznik nr 2 do SWZ)
- Bid bond (wadium) for each lot: PLN 3,000 for Part I, PLN 500 for Part II
- Electronic submission via platformazakupowa.pl

### Award criteria

- Lowest gross price (60% weight)
- Response time for urgent site visits (40% weight; 2 hours = 40 points, 3 hours = 20 points, 4 hours = 0 points)

## Disciplines

- **Project and construction management** (primary, 100%): Supervision of construction works, compliance verification, project management, and quality control for the stormwater collector projects in Gronowo and along Kordeckiego Street, including utility relocations and surface restorations.

## Related projects

- [Cycle and footpath construction: expanding a regional road for active travel](https://pelenoir.com/en/tenders-of-europe/projects/cycle-and-footpath-construction-expanding-a-regional-road-for-active-20218/) — Warszawa, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Road junction expansion: investor supervision for national road upgrade near Korzeniste](https://pelenoir.com/en/tenders-of-europe/projects/road-junction-expansion-investor-supervision-for-national-road-19353/) — Korzeniste, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [Hospital expansion: multi-trade supervision for rehabilitation day unit modernisation](https://pelenoir.com/en/tenders-of-europe/projects/hospital-expansion-multi-trade-supervision-for-rehabilitation-day-20814/) — Poznań, Poland · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Hospital refurbishment: cryotherapy suite in an active medical building](https://pelenoir.com/en/tenders-of-europe/projects/hospital-refurbishment-cryotherapy-suite-in-an-active-medical-building-19765/) — Warsaw, Poland · Service contract · deadline 2026-11-25 (closed 3 days ago)
- [County road reconstruction: 800-metre rebuild plus junction upgrade](https://pelenoir.com/en/tenders-of-europe/projects/county-road-reconstruction-800-metre-rebuild-plus-junction-upgrade-20429/) — Puck, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Kayak marina construction: investor supervision for water and electrical installations](https://pelenoir.com/en/tenders-of-europe/projects/kayak-marina-construction-investor-supervision-for-water-and-19955/) — Toporów, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df2602-ebaf-9344-5997-b20001063e96  
Original title: „Pełnienie nadzoru inwestorskiego dla zadań: Część I - „Budowa kolektora deszczowego „Gronowo”, Część II - „Budowa kolektora deszczowego wzdłuż ulicy Kordeckiego”

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/stormwater-collector-construction-supervision-in-leszno-14120/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
