---
title: "Stockerau - Retz selective double-track expansion"
url: "https://pelenoir.com/en/tenders-of-europe/projects/stockerau-retz-selective-double-track-expansion-76/"
id: 76
country: "Austria"
client: "ÖBB-Infrastruktur AG"
type: "Service contract"
procedure: "Negotiated procedure with prior publication (Verhandlungsverfahren mit öffentlicher Bekanntmachung)"
deadline: "2026-10-07"
status: "closed"
days_left: -52
status_as_of: "2026-11-28"
disciplines: ["Engineering","Sustainability"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/tender-detail?object=505019f6-4c66-4ce4-9700-a5ed3cf664c3-89262e54-95d8-46ae-bc08-a15e4fc77a83"
updated: "2026-09-21"
publisher: "Pelenoir – Tenders of Europe"
---

# Stockerau - Retz selective double-track expansion

> Environmental impact assessment (EIA) services for the selective double-track expansion of the [railway](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/) line between Stockerau and Retz, including impact reports on noise, air pollutants, light, and climate-energy concepts as part of the submission project…

**Status (2026-11-28):** Closed 52 days ago — deadline 2026-10-07  
**Location:** Austria  
**Contracting authority:** ÖBB-Infrastruktur AG  
**Opportunity type:** Service contract — Negotiated procedure with prior publication (Verhandlungsverfahren mit öffentlicher Bekanntmachung)  
**CPV:** 71300000 Engineering services; 71356400; 71330000 Miscellaneous engineering services  

## About the project

Environmental impact assessment (EIA) services for the selective double-track expansion of the railway line between Stockerau and Retz, including impact reports on noise, air pollutants, light, and climate-energy concepts as part of the submission project under the Austrian Environmental Impact Assessment Act (UVP-G). Optional services include the setup, operation, and evaluation of a climate and air quality monitoring station, as well as support during the detailed planning phase.

## Scope of work

Preparation of environmental impact assessment (EIA) reports for noise, air pollutants, light, and climate-energy concepts as part of the submission project for the selective double-track expansion of the railway line between Stockerau and Retz. Optional services include the establishment and operation of a climate and air quality monitoring station, as well as support during the detailed planning phase.

### Deliverables

- Impact report on noise (Wirkfaktorbericht Lärm)
- Impact report on light/glare/shading (Wirkfaktorbericht Licht/Blendung/Beschattung)
- Impact report on air pollutants (Wirkfaktorbericht Luftschadstoffe)
- Subject-specific specialist contributions on air and climate (Fachbeiträge Luft und Klima)
- Climate-energy concept (Klima-Energiekonzept)

### Required services

- Environmental impact assessment (EIA) services
- Technical planning services for railway infrastructure
- Climate and air quality monitoring (optional)
- Support during detailed planning phase (optional)

## Pelenoir assessment

The project scope is primarily focused on engineering and technical planning for the selective double-track expansion of a railway line, with a significant secondary emphasis on [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and environmental performance assessments. The deliverables include impact reports and climate-energy concepts, which require expertise in both engineering and sustainability disciplines.

## How to take part

### Who can apply

- No restrictive participation conditions stated
- Consortia limited to a maximum of 2 members

### What to submit

- Electronic submission via the Bieterportal (the original notice
- Two-envelope system (2-Kuvertsystem) for offers
- Submission of required documents in PDF, DOCX, or XLS format

### Award criteria

- Technically and economically most advantageous offer

## Tender documents

The visible document package includes participation forms and contract documents (e.g., 'AMV005_Ausschr-WF exkl ES EMF__1A-Teilnahmea.docx' and '.pdf'), project briefs and task descriptions (e.g., 'AMV005_Ausschr WF exkl ES EMF_2_Projektb.pdf' and '_3_Aufgabenb.pdf'), and submission guidelines (e.g., 'Anleitung_Abgabe des Angebotes im 2-Kuvertsystem_22062026.pdf'). Two ZIP archives ('Beilage_A (3).zip' and 'Beilage_B (4).zip') likely contain supplementary materials such as plans, drawings, or datasets, but their exact contents cannot be confirmed without access. The package appears to support the preparation and submission of offers for the environmental impact assessment services. Uncertainty remains about the full scope of files due to login restrictions.

## Disciplines

- **Engineering** (primary, 70%): Technical planning and engineering services for the railway infrastructure expansion, including structural, civil, and environmental engineering aspects such as noise, air pollutants, and light impact assessments.
- **Sustainability** (secondary, 30%): Development of climate-energy concepts, air and climate specialist contributions, and optional climate and air quality monitoring services to ensure sustainability and environmental performance of the railway infrastructure.

## Related projects

- [Military social club: structural redesign and extension for Biathlon World Championship 2028](https://pelenoir.com/en/tenders-of-europe/projects/military-social-club-structural-redesign-and-extension-for-biathlon-19293/) — Hochfilzen, Austria · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [District heating plant: new biomass facility with 2,000 kW thermal output](https://pelenoir.com/en/tenders-of-europe/projects/district-heating-plant-new-biomass-facility-with-2-000-kw-thermal-20463/) — Weitra, Austria · Service contract · deadline 2026-12-21 (23 days left to apply)
- [A10 ABM St. Michael refurbishment planning](https://pelenoir.com/en/tenders-of-europe/projects/a10-abm-st-michael-refurbishment-planning-17716/) — St. Michael im Lungau, Austria · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Tunnel safety coordination: Semmering expressway's Tanzenberg tunnel construction](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-safety-coordination-semmering-expressway-s-tanzenberg-tunnel-20323/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Linz Vbf West 4-track Western Railway Geotechnical Services](https://pelenoir.com/en/tenders-of-europe/projects/linz-vbf-west-4-track-western-railway-geotechnical-services-18055/) — Linz, Austria · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Motorway expansion: full upgrade of A5 Nord/Weinviertel from Poysbrunn to national border](https://pelenoir.com/en/tenders-of-europe/projects/motorway-expansion-full-upgrade-of-a5-nord-weinviertel-from-poysbrunn-19306/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/tender-detail?object=505019f6-4c66-4ce4-9700-a5ed3cf664c3-89262e54-95d8-46ae-bc08-a15e4fc77a83  
Original title: AMV005 Stockerau - Retz; selektiv 2-gleisiger Ausbau - UVE-Wirkfaktorb. Lärm, Luft, Licht, UVE-FB Luft/Klima, UVE-FB Klima-Energiekonzept

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/stockerau-retz-selective-double-track-expansion-76/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
