title: "Solar power plants on DARS facilities – Phase 3"
url: "https://pelenoir.com/en/tenders-of-europe/projects/solar-power-plants-on-dars-facilities-phase-3-13815/"
id: 13815
country: "Slovenia"
city: "Celje"
region: "Savinjska"
client: "DRUŽBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI D.D."
type: "Service contract"
procedure: "open procedure (Odprti postopek)"
deadline: "2026-10-23"
status: "closed"
days_left: -36
status_as_of: "2026-11-28"
disciplines: ["Engineering","Sustainability"]
source: "eNaročanje"
source_url: "https://www.enarocanje.si/#/pregled-objav/1200951"
updated: "2026-09-14"
publisher: "Pelenoir – Tenders of Europe"
---

# Solar power plants on DARS facilities – Phase 3

> Development of conceptual solutions and economic-technical analysis for the construction of solar power plants on [motorway](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) facilities managed by DARS in [Slovenia](https://pelenoir.com/en/tenders-of-europe/countries/slovenia/), as part of the third phase of the initiative.

**Status (2026-11-28):** Closed 36 days ago — deadline 2026-10-23 12:00  
**Location:** Celje, Savinjska, Slovenia  
**Contracting authority:** DRUŽBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI D.D.  
**Opportunity type:** Service contract — open procedure (Odprti postopek)  
**CPV:** 71321000 Engineering design services for mechanical and electrical installations for buildings  

## About the project

Development of conceptual solutions and economic-technical analysis for the construction of solar power plants on motorway facilities managed by DARS in Slovenia, as part of the third phase of the initiative.

## Scope of work

Development of conceptual solutions and economic-technical analysis for solar power plants on DARS motorway facilities, including electrical and mechanical [engineering design](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) services.

### Deliverables

- conceptual solutions for solar power plants
- economic-technical analysis (DGD/DNZO)
- design documentation for electrical and mechanical installations

### Required services

- building design services for mechanical and electrical installations
- engineering consultancy for solar power plant planning

## Pelenoir assessment

This project primarily involves engineering and technical planning for the design of solar power plants on motorway facilities, with a secondary focus on [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and building performance analysis. The scope is centered on mechanical and electrical engineering services, supported by economic-technical assessments for [renewable energy](https://pelenoir.com/en/tenders-of-europe/typologies/energy-and-utilities/) integration.

## How to take part

### Who can apply

- references from authorized electrical engineers
- compliance with public procurement documentation requirements

### What to submit

- tender offer in EUR excluding VAT
- supporting documentation as specified in the tender documents

### Award criteria

- Price (80% weight): Tender price in EUR excluding VAT
- Quality (20% weight): Additional references from authorized electrical engineers

## Tender documents

The visible ZIP file is named 'Dodatek-1_157-26.zip' and is likely an addendum or update to the tender documentation. Based on the filename and context, it probably contains revised contractual conditions, clarifications to previously issued documents, or updated submission forms. The file may also include responses to bidder questions or corrections to technical specifications. However, the exact contents cannot be confirmed without accessing the file, and no other document types or topics are visible in the tender context.

## Disciplines

- **Engineering** (primary, 80%): Design and engineering of mechanical and electrical installations for solar power plants on motorway facilities, including technical planning and integration with existing infrastructure.
- **Sustainability** (secondary, 20%): Economic-technical analysis (DGD/DNZO) for solar power plants, including energy performance, sustainability considerations, and feasibility assessment for renewable energy integration.

## Related projects

- [Hydroelectric plant reconstruction: design documentation for Solkan upgrade](https://pelenoir.com/en/tenders-of-europe/projects/hydroelectric-plant-reconstruction-design-documentation-for-solkan-19991/) — Nova Gorica, Slovenia · Service contract · deadline 2027-01-29 (62 days left to apply)
- [Rail extension design: new track infrastructure for Koper port logistics](https://pelenoir.com/en/tenders-of-europe/projects/rail-extension-design-new-track-infrastructure-for-koper-port-19994/) — Koper, Slovenia · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Road slope and wall repairs on four state highway sections](https://pelenoir.com/en/tenders-of-europe/projects/road-slope-and-wall-repairs-on-four-state-highway-sections-20569/) — Ljubljana, Slovenia · Service contract · deadline 2026-12-24 (26 days left to apply)
- [Road renewal and design: 620-metre section of regional road with structures](https://pelenoir.com/en/tenders-of-europe/projects/road-renewal-and-design-620-metre-section-of-regional-road-with-20680/) — Solkan, Slovenia · Service contract · deadline 2026-12-16 (18 days left to apply)
- [Road reconstruction: expert review and structural assessment of design documents](https://pelenoir.com/en/tenders-of-europe/projects/road-reconstruction-expert-review-and-structural-assessment-of-design-19438/) — Slovenia · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Railway Infrastructure Protection Design for NPr Section](https://pelenoir.com/en/tenders-of-europe/projects/railway-infrastructure-protection-design-for-npr-section-15993/) — Ljubljana, Slovenia · Service contract · deadline 2026-12-10 (12 days left to apply)

## Source

Original notice on eNaročanje: https://www.enarocanje.si/#/pregled-objav/1200951  
Original title: Izdelava idejnih rešitev in ekonomsko tehnične analize, DGD/DNZO za izgradnjo sončnih elektrarn na objektih DARS – 3. faza

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/solar-power-plants-on-dars-facilities-phase-3-13815/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json