---
title: "Sill Bridge Planning for Innsbruck Central Station Pedestrian and Cycle Underpass"
url: "https://pelenoir.com/en/tenders-of-europe/projects/sill-bridge-planning-for-innsbruck-central-station-pedestrian-and-18007/"
id: 18007
country: "Austria"
city: "Innsbruck"
region: "Tyrol"
client: "the contracting authority's contact"
type: "Service contract"
procedure: "Negotiated procedure with prior publication of a contract notice (Verhandlungsverfahren mit vorheriger Bekanntmachung)"
deadline: "2026-11-23"
status: "closed"
days_left: -5
status_as_of: "2026-11-28"
disciplines: ["Engineering","Urban design and planning"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=505019f6-4c66-4ce4-9700-a5ed3cf664c3-1d862757-d633-4d0a-8915-ecb629701b84"
updated: "2026-11-06"
publisher: "Pelenoir – Tenders of Europe"
---

# Sill Bridge Planning for Innsbruck Central Station Pedestrian and Cycle Underpass

> Planning services for a new [bridge](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) over the Sill River to connect a pedestrian and cycle underpass at Innsbruck Central Station with Anzengruberstraße and the eastern [tram line](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/).

**Status (2026-11-28):** Closed 5 days ago — deadline 2026-11-23  
**Location:** Innsbruck, Tyrol, Austria  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Service contract — Negotiated procedure with prior publication of a contract notice (Verhandlungsverfahren mit vorheriger Bekanntmachung)  
**CPV:** 71322300; 71242000 Project and design preparation, estimation of costs  

## About the project

Planning services for a new bridge over the Sill River to connect a pedestrian and cycle underpass at Innsbruck Central Station with Anzengruberstraße and the eastern tram line. The project includes preliminary design (Vorentwurf) with optional submission planning (Einreichplanung) and detailed planning (Detailplanung).

## Scope of work

Planning services for a bridge over the Sill River as part of the pedestrian and cycle underpass project at Innsbruck Central Station. The scope includes preliminary design (Vorentwurf) with optional submission planning (Einreichplanung) and detailed planning (Detailplanung) as extensions.

### Deliverables

- Preliminary design (Vorentwurf) for the Sill Bridge
- Optional submission planning (Einreichplanung)
- Optional detailed planning (Detailplanung)

### Required services

- Bridge planning and design
- Cost estimation
- Drafting and conceptual design

## Pelenoir assessment

This project is primarily an engineering and technical planning assignment for the design of a bridge over the Sill River, with a secondary focus on [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and planning to ensure the bridge integrates effectively with the surrounding transport infrastructure and public realm. The scope is dominated by structural and [civil engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/) requirements, while urban design addresses connectivity and spatial integration.

## How to take part

### Who can apply

- See tender documents for specific eligibility criteria

### What to submit

- Participation applications in German
- Electronic submission required via www.provia.at

### Award criteria

- Technically and economically most advantageous offer

## Tender documents

The visible documents likely include the tender's core planning requirements and procedural guidelines. The files named 'G31504_03_Aufgabenstellung_Planung_Sillbrücke.pdf' and 'G31504_02_Projektbeschreibung_Planung_Sillbrücke.pdf' probably contain the detailed project brief and technical specifications for the bridge planning. 'G31504_01_Grundlagen des Vergabeverfahrens_Planung_Sillbrücke.pdf' and 'G31504_01A_Teilnahmeantrag_Planung_Sillbrücke.pdf' are expected to outline the procurement process and participation forms. The file 'oebb_AGB_DL_2021_01.pdf' likely provides the general terms and conditions for service contracts. The exact content of these files cannot be confirmed without access, and no protected documents were downloaded.

## Disciplines

- **Engineering** (primary, 80%): Structural and civil engineering design for the Sill Bridge, including load-bearing calculations, material specifications, and technical integration with the pedestrian and cycle underpass infrastructure. The focus includes preliminary design (Vorentwurf), optional submission planning (Einreichplanung), and detailed planning (Detailplanung).
- **Urban design and planning** (secondary, 20%): Integration of the Sill Bridge into the urban context of Innsbruck Central Station, including connectivity to Anzengruberstraße and the eastern tram line, pedestrian and cycle flow optimization, and public-realm planning for the underpass and bridge approach areas.

## Related projects

- [New Building Part-F and Technical Building Services Supervision at Kufstein District Hospital](https://pelenoir.com/en/tenders-of-europe/projects/new-building-part-f-and-technical-building-services-supervision-at-16800/) — Kufstein, Austria · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Highway resurfacing: 5.4 km concrete road renewal with traffic management](https://pelenoir.com/en/tenders-of-europe/projects/highway-resurfacing-5-4-km-concrete-road-renewal-with-traffic-20068/) — Austria · Service contract · deadline 2027-01-12 (45 days left to apply)
- [Motorway expansion: full upgrade of A5 Nord/Weinviertel from Poysbrunn to national border](https://pelenoir.com/en/tenders-of-europe/projects/motorway-expansion-full-upgrade-of-a5-nord-weinviertel-from-poysbrunn-19306/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Railway Steel Bridge Acoustic Emission Monitoring System](https://pelenoir.com/en/tenders-of-europe/projects/railway-steel-bridge-acoustic-emission-monitoring-system-1630/) — Austria · Service contract · deadline 2100-01-01 (26 697 days left to apply)
- [Hochwasserschutz Ill km 11.6 to 20.5 Execution Planning](https://pelenoir.com/en/tenders-of-europe/projects/hochwasserschutz-ill-km-11-6-to-20-5-execution-planning-19015/) — Feldkirch, Austria · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Linz Vbf West 4-track Western Railway Geotechnical Services](https://pelenoir.com/en/tenders-of-europe/projects/linz-vbf-west-4-track-western-railway-geotechnical-services-18055/) — Linz, Austria · Service contract · deadline 2026-12-01 (3 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=505019f6-4c66-4ce4-9700-a5ed3cf664c3-1d862757-d633-4d0a-8915-ecb629701b84  
Original title: Innsbruck Hbf; Fuß- und Radwegunterführung; Planung - Planung Sillbrücke

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/sill-bridge-planning-for-innsbruck-central-station-pedestrian-and-18007/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
