---
title: "School thermal comfort: diagnosis and upgrades for three primary schools"
url: "https://pelenoir.com/en/tenders-of-europe/projects/school-thermal-comfort-diagnosis-and-upgrades-for-three-primary-20410/"
id: 20410
country: "France"
city: "Saint-Avertin"
region: "Centre-Val de Loire"
client: "Commune de Saint-Avertin"
type: "Service contract"
procedure: "Open procedure (Procédure Ouverte)"
deadline: "2026-12-15"
status: "open"
days_left: 17
status_as_of: "2026-11-28"
disciplines: ["Architecture","Engineering","Sustainability"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-112825"
updated: "2026-11-20"
publisher: "Pelenoir – Tenders of Europe"
---

# School thermal comfort: diagnosis and upgrades for three primary schools

> Diagnosis and improvement of summer and winter thermal comfort in three primary schools in Saint-Avertin, including design and implementation of [energy efficiency](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) measures.

**Status (2026-11-28):** 17 days left to apply — deadline 2026-12-15 22:00  
**Location:** Saint-Avertin, Centre-Val de Loire, France  
**Contracting authority:** Commune de Saint-Avertin  
**Opportunity type:** Service contract — Open procedure (Procédure Ouverte)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Diagnosis and improvement of summer and winter thermal comfort in three primary schools in Saint-Avertin, including design and implementation of energy efficiency measures.

## Scope of work

The contract covers the full scope of [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (maîtrise d'œuvre) for diagnosing and improving thermal comfort in three primary schools. This includes assessing current conditions, proposing energy efficiency solutions, and overseeing implementation.

### Deliverables

- Diagnostic reports for thermal comfort in summer and winter
- Design proposals for energy efficiency improvements
- Implementation oversight and project management

### Required services

- project management (maîtrise d'œuvre)
- thermal diagnostics
- energy efficiency design
- construction supervision

## Pelenoir assessment

This project involves a multidisciplinary approach to diagnose and upgrade thermal comfort in three primary schools. The primary focus is on [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) for energy efficiency measures, supported by technical engineering for diagnostics and building-services upgrades, and sustainability assessments to ensure optimal building performance.

## How to take part

### Who can apply

- Declaration on honour to confirm no exclusion criteria apply
- Proof of global turnover and turnover related to the contract's services over the last three years
- Declaration of average annual staff and management personnel for the last three years

## Disciplines

- **Architecture** (primary, 50%): Design of energy efficiency measures and building upgrades to improve thermal comfort in the three primary schools, including conceptual and technical design solutions.
- **Engineering** (secondary, 30%): Technical engineering for thermal diagnostics, structural assessments, and building-services upgrades (e.g., HVAC, insulation, ventilation) to enhance energy efficiency.
- **Sustainability** (secondary, 20%): Assessment of building performance, energy efficiency strategies, and sustainability measures to optimize thermal comfort in summer and winter conditions.

## Related projects

- [New municipal workshop and football clubhouse building](https://pelenoir.com/en/tenders-of-europe/projects/new-municipal-workshop-and-football-clubhouse-building-19743/) — Luzillat, France · Service contract · deadline 2027-01-05 (38 days left to apply)
- [Extension of Hochfelden sports complex](https://pelenoir.com/en/tenders-of-europe/projects/extension-of-hochfelden-sports-complex-18431/) — Hochfelden, France · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Prison service relocation: new design for SPIP office in Valence](https://pelenoir.com/en/tenders-of-europe/projects/prison-service-relocation-new-design-for-spip-office-in-valence-20206/) — Valence, France · Service contract · deadline 2026-12-11 (13 days left to apply)
- [Auditorium and foyer modernisation: heritage-listed cultural centre upgrade](https://pelenoir.com/en/tenders-of-europe/projects/auditorium-and-foyer-modernisation-heritage-listed-cultural-centre-19553/) — Paris, France · Service contract · deadline 2026-12-17 (19 days left to apply)
- [Restructuring of the north wing of Lacaze-Duthiers building at Roscoff Biological Station](https://pelenoir.com/en/tenders-of-europe/projects/restructuring-of-the-north-wing-of-lacaze-duthiers-building-at-13250/) — Roscoff, France · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Construction of 31 social housing units in Laval](https://pelenoir.com/en/tenders-of-europe/projects/construction-of-31-social-housing-units-in-laval-17437/) — Laval, France · Service contract · deadline 2026-12-09 (11 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-112825  
Original title: Mission de Maitrise d'oeuvre pour le diagnostic et l'amélioration du confort thermique été/hiver dans les écoles de Saint-Avertin

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/school-thermal-comfort-diagnosis-and-upgrades-for-three-primary-20410/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
