---
title: "S8 Marchfeld Expressway West Section Noise Study"
url: "https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-noise-study-16570/"
id: 16570
country: "Austria"
region: "Weinviertel"
client: "the contracting authority's contact (ASFINAG)"
type: "Service contract"
procedure: "open procedure (Offenes Verfahren)"
deadline: "2026-12-07"
status: "open"
days_left: 9
status_as_of: "2026-11-28"
disciplines: ["Engineering","Specialist consulting"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-83e4f01b-6f58-4cff-b199-1bffc7b4a89e"
updated: "2026-10-28"
publisher: "Pelenoir – Tenders of Europe"
---

# S8 Marchfeld Expressway West Section Noise Study

> Noise investigation for the S8 Marchfeld Expressway West section as part of an ongoing complaint procedure during the planning phase (Einreichprojekt).

**Status (2026-11-28):** 9 days left to apply — deadline 2026-12-07  
**Location:** Weinviertel, Austria  
**Contracting authority:** the contracting authority's contact (ASFINAG)  
**Opportunity type:** Service contract — open procedure (Offenes Verfahren)  
**CPV:** 71240000 Architectural, engineering and planning services  

## About the project

Noise investigation for the S8 Marchfeld Expressway West section as part of an ongoing complaint procedure during the planning phase (Einreichprojekt). The goal is to achieve legally binding project approval through the Federal Administrative Court (BVwG) process.

## Scope of work

Conduct a noise investigation for the S8 Marchfeld Expressway West section as part of an ongoing complaint procedure during the planning phase. The objective is to achieve legally binding project approval through the Federal Administrative Court (BVwG) process.

### Deliverables

- Noise investigation report for the planning phase (Einreichprojekt)

### Required services

- noise protection study
- environmental impact assessment support
- planning phase documentation

## Pelenoir assessment

This project is primarily a technical engineering assignment focused on noise investigation and environmental impact assessment for a transport infrastructure project during its planning phase. It also includes specialist consulting to support the complaint procedure and achieve legally binding project approval.

## How to take part

### Who can apply

- Eligibility criteria specified in tender documents
- Consortium allowed (maximum 2 members)

### What to submit

- Offers must be submitted electronically via www.provia.at
- Submission language: German
- Electronic invoicing required

### Award criteria

- Price (net total price as per documents)
- Quality (offered quality as per documents)

## Tender documents

The visible document package includes a ZIP file named 'AU_Lärm_S8West.zip,' likely containing noise study-related documents for the S8 Marchfeld Expressway West section. The file name suggests it may include technical reports, noise measurement data, or environmental impact assessments relevant to the planning phase. An XLS file is referenced for document uploads, which may contain submission forms or templates for bidder responses. The exact contents of the ZIP file remain uncertain, as the portal requires login and the files were not downloaded. No detailed breakdown of the ZIP contents is provided in the visible context.

## Disciplines

- **Engineering** (primary, 80%): Technical noise investigation, environmental impact assessment support, and planning phase documentation for the S8 Marchfeld Expressway West section to achieve legally binding project approval.
- **Specialist consulting** (secondary, 20%): Specialist advisory support for the complaint procedure, including legal and procedural compliance to facilitate project approval through the Federal Administrative Court (BVwG) process.

## Related projects

- [Tunnel safety coordination: Semmering expressway's Tanzenberg tunnel construction](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-safety-coordination-semmering-expressway-s-tanzenberg-tunnel-20323/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Bridge condition surveys: structural inspections for 11 motorway lots in Austria](https://pelenoir.com/en/tenders-of-europe/projects/bridge-condition-surveys-structural-inspections-for-11-motorway-lots-19701/) — Austria · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Motorway expansion: full upgrade of A5 Nord/Weinviertel from Poysbrunn to national border](https://pelenoir.com/en/tenders-of-europe/projects/motorway-expansion-full-upgrade-of-a5-nord-weinviertel-from-poysbrunn-19306/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Senningbach and tributaries flood studies and hazard zone planning](https://pelenoir.com/en/tenders-of-europe/projects/senningbach-and-tributaries-flood-studies-and-hazard-zone-planning-18165/) — Austria · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Gas and Heat Network BWI and Planning Framework Agreement](https://pelenoir.com/en/tenders-of-europe/projects/gas-and-heat-network-bwi-and-planning-framework-agreement-18988/) — Eisenstadt, Siegendorf, Frauenkirchen, Austria · Service contract · deadline 2026-11-26 (closed 2 days ago)
- [District heating plant: new biomass facility with 2,000 kW thermal output](https://pelenoir.com/en/tenders-of-europe/projects/district-heating-plant-new-biomass-facility-with-2-000-kw-thermal-20463/) — Weitra, Austria · Service contract · deadline 2026-12-21 (23 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-83e4f01b-6f58-4cff-b199-1bffc7b4a89e  
Original title: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Lärmtechnische Untersuchung im anhängigen Beschwerdeverfahren in der Planungsphase EP

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-noise-study-16570/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
