---
title: "S8 Marchfeld Expressway West Section Environmental Procedure Management"
url: "https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-environmental-procedure-17626/"
id: 17626
country: "Austria"
city: "Gänserndorf/Obersiebenbrunn"
region: "Weinviertel"
client: "Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG)"
type: "Service contract"
procedure: "Open procedure (Offenes Verfahren)"
deadline: "2026-11-17"
status: "closed"
days_left: -11
status_as_of: "2026-11-28"
disciplines: ["Engineering","Project and construction management","Specialist consulting"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-65c32d0e-bf0c-42c2-a6c7-2371fca89221"
updated: "2026-11-02"
publisher: "Pelenoir – Tenders of Europe"
---

# S8 Marchfeld Expressway West Section Environmental Procedure Management

> Management and coordination of environmental approval procedures for the western section of the S8 Marchfeld Expressway, including ongoing environmental impact assessment (UVP) complaint procedures, project amendment processes, and legal appeals at the…

**Status (2026-11-28):** Closed 11 days ago — deadline 2026-11-17  
**Location:** Gänserndorf/Obersiebenbrunn, Weinviertel, Austria  
**Contracting authority:** Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG)  
**Opportunity type:** Service contract — Open procedure (Offenes Verfahren)  
**CPV:** 71240000 Architectural, engineering and planning services  

## About the project

Management and coordination of environmental approval procedures for the western section of the S8 Marchfeld Expressway, including ongoing environmental impact assessment (UVP) complaint procedures, project amendment processes, and legal appeals at the Federal Administrative Court (BVwG).

## Scope of work

Coordination and management of environmental approval procedures for the S8 Marchfeld Expressway western section, including ongoing environmental impact assessment (UVP) complaint procedures, project amendments, and legal appeals at the Federal Administrative Court (BVwG). Services include procedural steering, compliance with regulatory requirements, and support through all phases of the approval process.

### Deliverables

- Procedural steering for environmental approval processes
- Support for UVP complaint procedures and legal appeals
- Coordination of project amendments and regulatory compliance

### Required services

- Environmental planning and coordination
- Regulatory compliance and procedural management
- Legal and administrative support for approval processes

## Pelenoir assessment

This project focuses on the management and coordination of environmental approval procedures for a major transport infrastructure project. The primary scope involves technical and engineering support for regulatory compliance, environmental impact assessments, and procedural adjustments, with secondary emphasis on [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) and specialist consulting for legal and administrative challenges.

## How to take part

### Who can apply

- Open to bidders with relevant experience in environmental planning and regulatory compliance for infrastructure projects
- Consortia allowed with a maximum of 2 members

### What to submit

- Offers must be submitted electronically via www.provia.at
- Submission language: German
- Required documents: technical and financial proposals, compliance with tender specifications

### Award criteria

- Price (net total price as per tender documents)
- Quality (offered quality as per tender documents)

## Tender documents

The visible files include tender documents, bidder question responses, and contractual conditions. The ZIP archive (AU_Verfahrenssteuerung_Umwelt_S8West.zip) likely contains detailed environmental planning documents, procedural guidelines, and project-specific requirements for the S8 Marchfeld Expressway approval process. The PDF files appear to include corrections to the tender, special contractual conditions, and answers to bidder questions. The exact contents of the ZIP file cannot be confirmed without access, but the filenames suggest a focus on environmental procedure management and regulatory compliance.

## Disciplines

- **Engineering** (primary, 60%): Technical coordination and engineering support for environmental approval procedures, including compliance with regulatory requirements, project amendments, and legal appeals related to the S8 Marchfeld Expressway.
- **Project and construction management** (secondary, 30%): Management and coordination of the environmental approval process, including timeline adherence, stakeholder alignment, and procedural oversight for the S8 Marchfeld Expressway project.
- **Specialist consulting** (secondary, 10%): Specialist advisory services for legal appeals, environmental compliance, and procedural adjustments during the approval process for the S8 Marchfeld Expressway.

## Related projects

- [Tunnel safety coordination: Semmering expressway's Tanzenberg tunnel construction](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-safety-coordination-semmering-expressway-s-tanzenberg-tunnel-20323/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [New Building Part-F and Technical Building Services Supervision at Kufstein District Hospital](https://pelenoir.com/en/tenders-of-europe/projects/new-building-part-f-and-technical-building-services-supervision-at-16800/) — Kufstein, Austria · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Senningbach and tributaries flood studies and hazard zone planning](https://pelenoir.com/en/tenders-of-europe/projects/senningbach-and-tributaries-flood-studies-and-hazard-zone-planning-18165/) — Austria · Service contract · deadline 2026-12-18 (20 days left to apply)
- [Tunnel ventilation upgrade: planning and tender for two motorway tunnels](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-ventilation-upgrade-planning-and-tender-for-two-motorway-19882/) — Vienna, Austria · Service contract · deadline 2027-01-18 (51 days left to apply)
- [Motorway expansion: full upgrade of A5 Nord/Weinviertel from Poysbrunn to national border](https://pelenoir.com/en/tenders-of-europe/projects/motorway-expansion-full-upgrade-of-a5-nord-weinviertel-from-poysbrunn-19306/) — Austria · Service contract · deadline 2026-12-14 (16 days left to apply)
- [Noise impact study for Marchfeld motorway western section](https://pelenoir.com/en/tenders-of-europe/projects/noise-impact-study-for-marchfeld-motorway-western-section-19299/) — Austria · Service contract · deadline 2026-12-07 (9 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-65c32d0e-bf0c-42c2-a6c7-2371fca89221  
Original title: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Verfahrenssteuerung Umwelt bei laufenden Genehmigungsverfahren

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-environmental-procedure-17626/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
