---
title: "S8 Marchfeld Expressway West Section Air and Climate Planning"
url: "https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-air-and-climate-planning-16569/"
id: 16569
country: "Austria"
city: "Gänserndorf"
region: "Weinviertel"
client: "Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG)"
type: "Service contract"
procedure: "open procedure (Offenes Verfahren)"
deadline: "2026-12-03"
status: "closing"
days_left: 5
status_as_of: "2026-11-28"
disciplines: ["Engineering","Sustainability"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-63b503e9-29bf-4b67-b5f9-68480b189b6a"
updated: "2026-10-28"
publisher: "Pelenoir – Tenders of Europe"
---

# S8 Marchfeld Expressway West Section Air and Climate Planning

> Planning services for the air and climate specialist contribution for the western section of the S8 Marchfeld Expressway between the S1/S8 interchange and the Gänserndorf junction, as part of an ongoing complaint procedure.

**Status (2026-11-28):** 5 days left to apply — deadline 2026-12-03  
**Location:** Gänserndorf, Weinviertel, Austria  
**Contracting authority:** Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft (ASFINAG)  
**Opportunity type:** Service contract — open procedure (Offenes Verfahren)  
**CPV:** 71240000 Architectural, engineering and planning services  

## About the project

Planning services for the air and climate specialist contribution for the western section of the S8 Marchfeld Expressway between the S1/S8 interchange and the Gänserndorf junction, as part of an ongoing complaint procedure.

## Scope of work

Preparation of the specialist air and climate contribution for the western section of the S8 Marchfeld Expressway, including planning services for environmental impact assessment as part of an ongoing complaint procedure.

### Deliverables

- Fachbeitrag Luft und Klima (specialist air and climate contribution)

### Required services

- environmental planning
- air quality assessment
- climate impact analysis
- engineering consultancy

## Pelenoir assessment

The project is primarily an engineering and technical planning assignment for the western section of the S8 Marchfeld Expressway, with a focus on air quality and climate impact analysis as part of an environmental planning process. The scope also includes [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and building performance aspects, particularly in assessing the environmental effects of the highway infrastructure.

## How to take part

### Who can apply

- Open to [architecture](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/) and engineering firms with relevant experience
- Submissions must be in German
- Electronic submission required via www.provia.at

### What to submit

- Offers must remain valid for 3 months
- Electronic submission of documents (.pdf, .xls, .onlv, etc.)

### Award criteria

- Price (net total price as per documents)
- Quality (offered quality as per documents)

## Tender documents

The visible document package includes a ZIP archive named 'AU_Luft_Klima_S8West.zip,' likely containing the core tender documents for the air and climate planning services. The archive may include environmental impact assessments, technical specifications, and planning drawings related to air quality and climate analysis for the highway section. A file labeled 'Dokumentenupload (.pdf, .xls' suggests the presence of submission templates or forms, possibly in Excel format. The exact contents of the ZIP file cannot be confirmed without access, but the filenames indicate a focus on environmental planning deliverables.

## Disciplines

- **Engineering** (primary, 70%): Technical planning and engineering consultancy for air quality assessment and climate impact analysis related to the highway infrastructure, including environmental impact assessment and specialist contributions.
- **Sustainability** (secondary, 30%): Specialist contributions focused on air and climate impacts, including environmental sustainability and performance analysis for the highway section.

## Related projects

- [Highway resurfacing: 5.4 km concrete road renewal with traffic management](https://pelenoir.com/en/tenders-of-europe/projects/highway-resurfacing-5-4-km-concrete-road-renewal-with-traffic-20068/) — Austria · Service contract · deadline 2027-01-12 (45 days left to apply)
- [Railway traffic impact study for selective two-track expansion](https://pelenoir.com/en/tenders-of-europe/projects/railway-traffic-impact-study-for-selective-two-track-expansion-20278/) — Stockerau, Austria · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Tunnel ventilation upgrade: planning and tender for two motorway tunnels](https://pelenoir.com/en/tenders-of-europe/projects/tunnel-ventilation-upgrade-planning-and-tender-for-two-motorway-19882/) — Vienna, Austria · Service contract · deadline 2027-01-18 (51 days left to apply)
- [ASFINAG Bridge Inspections 2027 – Part 01](https://pelenoir.com/en/tenders-of-europe/projects/asfinag-bridge-inspections-2027-part-01-18048/) — Austria · Service contract · deadline 2026-11-30 (2 days left to apply)
- [Military social club: structural redesign and extension for Biathlon World Championship 2028](https://pelenoir.com/en/tenders-of-europe/projects/military-social-club-structural-redesign-and-extension-for-biathlon-19293/) — Hochfilzen, Austria · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Transformer fire suppression systems: on-site mechanical and electrical supervision nationwide](https://pelenoir.com/en/tenders-of-europe/projects/transformer-fire-suppression-systems-on-site-mechanical-and-20062/) — Austria · Service contract · deadline 2026-12-10 (12 days left to apply)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-63b503e9-29bf-4b67-b5f9-68480b189b6a  
Original title: S 8 Marchfeld Schnellstraße Abschnitt West - KN S 1/S 8 bis ASt L9 - Luft und Klima im anhängigen Beschwerdeverfahren Planungsphase EP

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/s8-marchfeld-expressway-west-section-air-and-climate-planning-16569/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
