---
title: "Road infrastructure: dynamic framework for planning and design services"
url: "https://pelenoir.com/en/tenders-of-europe/projects/road-infrastructure-dynamic-framework-for-planning-and-design-services-19183/"
id: 19183
country: "Norway"
city: "Kristiansand S"
region: "Agder"
client: "the contracting authority's contact"
type: "Framework agreement"
procedure: "Dynamic purchasing scheme (DPS) with restricted procedure for individual competitions"
deadline: "2028-06-23"
status: "open"
days_left: 573
status_as_of: "2026-11-28"
value: "NOK 100 m (≈ EUR 9.3 m)"
disciplines: ["Engineering","Urban design and planning","BIM and digital delivery"]
source: "Doffin"
source_url: "https://www.doffin.no/notices/2026-117640"
updated: "2026-11-13"
publisher: "Pelenoir – Tenders of Europe"
---

# Road infrastructure: dynamic framework for planning and design services

> A dynamic purchasing scheme for road infrastructure means planning for both today’s sketch and tomorrow’s construction.

**Status (2026-11-28):** 573 days left to apply — deadline 2028-06-23 10:00  
**Location:** Kristiansand S, Agder, Norway  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Framework agreement — Dynamic purchasing scheme (DPS) with restricted procedure for individual competitions  
**Declared value:** NOK 100 m (≈ EUR 9.3 m)  
**CPV:** 71300000 Engineering services; 70120000; 71000000 Architectural, construction, engineering and inspection services; 70000000; 70100000  

## About the project

Dynamic purchasing scheme (DPS) for planning and design services related to road infrastructure projects in Agder, including sketch phases, pre-projects, zoning plans with technical detail plans, construction plans with competition basis, and follow-up during the construction phase. The scheme also covers design of new road facilities and structures, necessary studies, calculations, and analyses.

## Why it matters

A dynamic purchasing scheme for road infrastructure in Agder means planning for both today’s sketch and tomorrow’s construction.

## Scope of work

Planning and design services for road infrastructure projects, including sketch phases, pre-projects, zoning plans with technical detail plans, construction plans with competition basis, and follow-up during construction. The scheme also covers design of new road facilities, structures, studies, calculations, and analyses. Individual competitions under the DPS will specify requirements, award criteria, and deadlines.

### Deliverables

- sketch phases
- pre-projects
- zoning plans with technical detail plans
- construction plans with competition basis
- follow-up during construction phase
- design of new road facilities and structures
- studies, calculations, and analyses

### Required services

- [engineering services](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- transport planning
- civil engineering design
- [BIM](https://pelenoir.com/en/tenders-of-europe/disciplines/bim/) modelling
- cost estimation

## Pelenoir assessment

This project is primarily focused on engineering and technical planning for road infrastructure, including design, calculations, and construction-phase follow-up. It also involves [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and planning for zoning and spatial integration, as well as BIM and digital delivery for coordination and information management.

## How to take part

### Who can apply

- Suppliers previously approved in the old EU-supply scheme are automatically transferred and do not need to reapply.
- New applicants must submit requests in this competition.

### What to submit

- Submissions must be in Norwegian.
- Electronic submission is mandatory via the specified platform the original notice

### Award criteria

- Climate and environment (30% weight)
- Quality (40% weight)
- Price (30% weight)

## Disciplines

- **Engineering** (primary, 70%): Structural, civil, and technical engineering for road infrastructure, including design of new road facilities, structures, calculations, and analyses. This also covers technical detail plans, construction plans, and follow-up during the construction phase.
- **Urban design and planning** (secondary, 20%): Zoning plans and spatial planning for road infrastructure, including integration of technical detail plans and coordination of public-realm elements within the transport network.
- **BIM and digital delivery** (secondary, 10%): BIM modelling, digital coordination, and information management for road infrastructure projects, including adherence to Agder fylkeskommune’s BIM manual and digital collaboration standards.

## Related projects

- [Structural engineering framework: multi-year consultancy for municipal building projects](https://pelenoir.com/en/tenders-of-europe/projects/structural-engineering-framework-multi-year-consultancy-for-municipal-20194/) — Sandvika, Norway · Framework agreement · deadline 2026-12-21 (23 days left to apply)
- [Framework agreement for structural engineering, building physics and acoustics consultancy](https://pelenoir.com/en/tenders-of-europe/projects/framework-agreement-for-structural-engineering-building-physics-and-19933/) — Sandvika, Norway · Framework agreement · deadline 2026-12-21 (23 days left to apply)
- [Bærum Municipality RIV Engineering Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/baerum-municipality-riv-engineering-services-framework-17434/) — Sandvika, Norway · Framework agreement · deadline 2026-12-03 (5 days left to apply)
- [Haugesund Municipality Consulting Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/haugesund-municipality-consulting-services-framework-15971/) — Haugesund, Norway · Framework agreement · deadline 2026-11-27 (closed 1 day ago)
- [Agder County Engineering Consultancy Framework](https://pelenoir.com/en/tenders-of-europe/projects/agder-county-engineering-consultancy-framework-9725/) — Kristiansand, Norway · Framework agreement · deadline 2030-02-20 (1 180 days left to apply)
- [Light rail design: multi-discipline framework for Norway’s expanding urban network](https://pelenoir.com/en/tenders-of-europe/projects/light-rail-design-multi-discipline-framework-for-norways-expanding-20195/) — Norway · Framework agreement · deadline 2026-11-30 (2 days left to apply)

## Source

Original notice on Doffin: https://www.doffin.no/notices/2026-117640  
Original title: Plan- og prosjekteringstjenester, utbygging veg

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/road-infrastructure-dynamic-framework-for-planning-and-design-services-19183/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
