---
title: "Road expansion: multi-discipline construction supervision for a county road upgrade"
url: "https://pelenoir.com/en/tenders-of-europe/projects/road-expansion-multi-discipline-construction-supervision-for-a-county-21000/"
id: 21000
country: "Poland"
city: "Wołomin"
region: "Mazowieckie"
client: "POWIAT WOŁOMIŃSKI"
type: "Service contract"
procedure: "basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)"
deadline: "2026-12-03"
status: "closing"
days_left: 5
status_as_of: "2026-11-28"
disciplines: ["Project and construction management"]
source: "e-Zamowienia"
source_url: "https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df4afa-3004-45cf-9ef4-5c0001e7eedc"
updated: "2026-11-25"
publisher: "Pelenoir – Tenders of Europe"
---

# Road expansion: multi-discipline construction supervision for a county road upgrade

> Supervising a county road expansion: where oversight begins before the first shovel hits the ground.

**Status (2026-11-28):** 5 days left to apply — deadline 2026-12-03 10:00  
**Location:** Wołomin, Mazowieckie, Poland  
**Contracting authority:** POWIAT WOŁOMIŃSKI  
**Opportunity type:** Service contract — basic procedure (art. 275 pkt 1 of the Polish Public Procurement Law)  
**CPV:** 71520000 Construction supervision services  

## About the project

Comprehensive multi-discipline investor supervision services for the expansion of county road No. 4325W between the intersection of Warszawska and Głowackiego streets and the intersection of Przemysłowa and J. Adamowicza streets in Tłuszcz municipality.

## Why it matters

Multi-discipline [construction supervision](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) for a county road upgrade demands oversight of civil, sanitary, electrical, and telecom works. A quiet framework for execution.

## Scope of work

Multi-discipline construction supervision services for road expansion, including oversight of civil, sanitary, electrical, and telecommunication works. The supervisor must monitor compliance with design documentation, construction standards, and safety regulations, participate in inspections, and prepare reports.

### Deliverables

- Construction supervision reports
- Inspection records
- Progress documentation
- Final acceptance documentation

### Required services

- Investor supervision (multi-discipline)
- Road construction oversight
- Sanitary installations supervision
- Electrical and telecommunication installations supervision

## Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it involves comprehensive multi-discipline investor supervision for a road expansion, focusing on construction oversight, compliance monitoring, and reporting. No other AEC business groups are explicitly supported by the extracted scope, as the tender does not mention [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), [urban planning](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/), landscape, engineering delivery, or other disciplines beyond supervision.

## How to take part

### Who can apply

- Contractor must have completed at least two similar supervision services for public road projects worth at least PLN 5,000,000 gross each in the last three years
- Contractor must employ certified inspectors for road, sanitary, electrical, and telecommunication disciplines
- Inspectors must hold valid construction licenses and be members of the relevant professional chamber

### What to submit

- Offer in Polish
- List of completed supervision services with references
- List of inspectors with qualifications and experience
- Statutory declarations and documents as specified in the tender

### Award criteria

- Price (60% weight)
- Response time to client requests (40% weight)

## Disciplines

- **Project and construction management** (primary, 100%): Comprehensive multi-discipline investor supervision for the road expansion, including oversight of civil, sanitary, electrical, and telecommunication works, compliance monitoring, inspections, and reporting.

## Related projects

- [Road maintenance depot refurbishment: redesign and rebuild of a regional road agency facility](https://pelenoir.com/en/tenders-of-europe/projects/road-maintenance-depot-refurbishment-redesign-and-rebuild-of-a-20999/) — Kock, Poland · Service contract · deadline 2026-12-04 (6 days left to apply)
- [Sailing marina construction: lakeside facility with landscaping in Mrągowo](https://pelenoir.com/en/tenders-of-europe/projects/sailing-marina-construction-lakeside-facility-with-landscaping-in-20661/) — Mrągowo, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [County road reconstruction: 800-metre rebuild plus junction upgrade](https://pelenoir.com/en/tenders-of-europe/projects/county-road-reconstruction-800-metre-rebuild-plus-junction-upgrade-20429/) — Puck, Poland · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Termomodernisation of ZUS Branch Buildings in Bielsko-Biała](https://pelenoir.com/en/tenders-of-europe/projects/termomodernisation-of-zus-branch-buildings-in-bielsko-biala-18121/) — Bielsko-Biała, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)
- [Heritage culture centre: multi-discipline supervision for modernisation and conversion](https://pelenoir.com/en/tenders-of-europe/projects/heritage-culture-centre-multi-discipline-supervision-for-20822/) — Ząbkowice Śląskie, Poland · Service contract · deadline 2026-12-02 (4 days left to apply)
- [Sanitary sewer network: 1 km new gravity pipeline for Strzyżów](https://pelenoir.com/en/tenders-of-europe/projects/sanitary-sewer-network-1-km-new-gravity-pipeline-for-strzyzow-20207/) — Strzyżów, Poland · Service contract · deadline 2026-11-27 (closed 1 day ago)

## Source

Original notice on e-Zamowienia: https://ezamowienia.gov.pl/mo-client-board/bzp/notice-details/id/08df4afa-3004-45cf-9ef4-5c0001e7eedc  
Original title: Pełnienie kompleksowego wielobranżowego nadzoru inwestorskiego -Rozbudowa drogi powiatowej Nr 4325W na odcinku od skrzyżowania ul. Warszawskiej i Głowackiego do skrzyżowania ul. Przemysłowej (...)

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/road-expansion-multi-discipline-construction-supervision-for-a-county-21000/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
