---
title: "RN57 La Main to La Vrine road upgrade regulatory procedures"
url: "https://pelenoir.com/en/tenders-of-europe/projects/rn57-la-main-to-la-vrine-road-upgrade-regulatory-procedures-15277/"
id: 15277
country: "France"
city: "Besançon"
region: "Bourgogne-Franche-Comté"
client: "DREAL Bourgogne-Franche-Comté"
type: "Service contract"
procedure: "Open procedure (Procédure Ouverte)"
deadline: "2026-11-19"
status: "closed"
days_left: -9
status_as_of: "2026-11-28"
disciplines: ["Engineering","Sustainability","Project and construction management"]
source: "BOAMP"
source_url: "https://www.boamp.fr/pages/avis/?q=idweb:26-101325"
updated: "2026-10-20"
publisher: "Pelenoir – Tenders of Europe"
---

# RN57 La Main to La Vrine road upgrade regulatory procedures

> Design and management of regulatory procedures (DUP dossier, Environmental Authorization dossier) for the upgrade of the RN57 national road between La Main and La Vrine in Doubs, [France](https://pelenoir.com/en/tenders-of-europe/countries/france/)

**Status (2026-11-28):** Closed 9 days ago — deadline 2026-11-19 12:00  
**Location:** Besançon, Bourgogne-Franche-Comté, France  
**Contracting authority:** DREAL Bourgogne-Franche-Comté  
**Opportunity type:** Service contract — Open procedure (Procédure Ouverte)  
**CPV:** 71000000 Architectural, construction, engineering and inspection services  

## About the project

Design and management of regulatory procedures (DUP dossier, Environmental Authorization dossier) for the upgrade of the RN57 national road between La Main and La Vrine in Doubs, France

## Scope of work

Design and management of regulatory procedures including the DUP dossier (Déclaration d'Utilité Publique) and Environmental Authorization dossier for the RN57 road upgrade project

### Deliverables

- DUP dossier (Déclaration d'Utilité Publique)
- Environmental Authorization dossier

### Required services

- [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) (maîtrise d'œuvre)
- regulatory procedure design
- environmental impact assessment coordination

## Pelenoir assessment

This project primarily involves engineering and technical planning for the design and management of regulatory procedures related to a road infrastructure upgrade. Secondary aspects include [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) and environmental performance work for the Environmental Authorization dossier, as well as project management for coordinating the regulatory process.

## How to take part

### Who can apply

- Open to all qualified service providers under French public procurement law
- No reserved procurement or execution requirements

### What to submit

- Electronic submission required
- E-invoicing required for contract execution

### Award criteria

- Social and environmental criteria

## Disciplines

- **Engineering** (primary, 70%): Design and technical coordination of regulatory procedures, including structural and civil engineering aspects for the road upgrade, as well as infrastructure planning and environmental impact assessment support.
- **Sustainability** (secondary, 20%): Coordination and preparation of the Environmental Authorization dossier, including sustainability assessments, environmental impact mitigation, and compliance with environmental regulations.
- **Project and construction management** (secondary, 10%): Project management (maîtrise d'œuvre) for the regulatory procedures, including coordination of deliverables, timelines, and stakeholder engagement.

## Related projects

- [Road tunnel safety upgrade: existing tunnel widening or new build on RN5](https://pelenoir.com/en/tenders-of-europe/projects/road-tunnel-safety-upgrade-existing-tunnel-widening-or-new-build-on-19186/) — Cilaos, France · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Haut Bugey Agglomeration Water and Sanitation Infrastructure Framework](https://pelenoir.com/en/tenders-of-europe/projects/haut-bugey-agglomeration-water-and-sanitation-infrastructure-framework-18188/) — Oyonnax, France · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Replacement of air handling units at Université de Lille Pont de Bois Campus](https://pelenoir.com/en/tenders-of-europe/projects/replacement-of-air-handling-units-at-universite-de-lille-pont-de-bois-18430/) — Villeneuve d'Ascq, France · Service contract · deadline 2026-12-17 (19 days left to apply)
- [Reconstruction of Sully Bridge in Paris](https://pelenoir.com/en/tenders-of-europe/projects/reconstruction-of-sully-bridge-in-paris-15918/) — Paris, France · Service contract · deadline 2026-12-01 (3 days left to apply)
- [Bridge and structure renovation: engineering design services for public infrastructure](https://pelenoir.com/en/tenders-of-europe/projects/bridge-and-structure-renovation-engineering-design-services-for-20800/) — Villefranche-de-Rouergue, France · Service contract · deadline 2027-01-07 (40 days left to apply)
- [Framework agreement for water and wastewater engineering services](https://pelenoir.com/en/tenders-of-europe/projects/framework-agreement-for-water-and-wastewater-engineering-services-15920/) — Quimperlé, France · Service contract · deadline 2026-11-30 (2 days left to apply)

## Source

Original notice on BOAMP: https://www.boamp.fr/pages/avis/?q=idweb:26-101325  
Original title: Mission de maîtrise d'œuvre concernant les procédures réglementaires (Dossier DUP, Dossier d'Autorisation Environnementale) relative à l'opération d'aménagement de la RN57 entre La Main et La Vrine

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/rn57-la-main-to-la-vrine-road-upgrade-regulatory-procedures-15277/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
