---
title: "Replacement of two ÖBB overpasses on A12 Inntal Autobahn"
url: "https://pelenoir.com/en/tenders-of-europe/projects/replacement-of-two-obb-overpasses-on-a12-inntal-autobahn-14614/"
id: 14614
country: "Austria"
city: "Kufstein"
region: "Tyrol"
client: "the contracting authority's contact (ASFINAG)"
type: "Service contract"
procedure: "open procedure (Offenes Verfahren)"
deadline: "2026-11-13"
status: "closed"
days_left: -16
status_as_of: "2026-11-29"
disciplines: ["Engineering","Project and construction management","Urban design and planning"]
source: "Austrian Public Procurement Search"
source_url: "https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-b1faa57a-d14a-43bb-851c-cf424d3b5432"
updated: "2026-10-14"
publisher: "Pelenoir – Tenders of Europe"
---

# Replacement of two ÖBB overpasses on A12 Inntal Autobahn

> Design and planning services for the replacement of two [railway](https://pelenoir.com/en/tenders-of-europe/typologies/rail-and-public-transport/) overpasses on the A12 Inntal Autobahn, including demolition, traffic management during construction, and detailed planning phases.

**Status (2026-11-29):** Closed 16 days ago — deadline 2026-11-13  
**Location:** Kufstein, Tyrol, Austria  
**Contracting authority:** the contracting authority's contact (ASFINAG)  
**Opportunity type:** Service contract — open procedure (Offenes Verfahren)  
**CPV:** 71322300  

## About the project

Design and planning services for the replacement of two railway overpasses on the A12 Inntal Autobahn, including demolition, traffic management during construction, and detailed planning phases.

## Scope of work

Design and planning services for the replacement of two ÖBB railway overpasses, including conceptual, demolition, traffic management, and detailed execution planning. The project must comply with ÖBB safety and operational requirements.

### Deliverables

- Ausschreibungsplanung (tender planning)
- Ausführungsplanung (execution planning)
- Detailplanung (detailed planning)
- Bestandsplanung (as-built planning)

### Required services

- [bridge](https://pelenoir.com/en/tenders-of-europe/typologies/roads-and-bridges/) design
- demolition planning
- traffic management planning
- [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)

## Pelenoir assessment

This project is primarily an engineering and technical planning endeavor focused on the replacement of two railway overpasses, with a strong emphasis on structural design, bridge engineering, and compliance with railway safety standards. Secondary aspects include project and [construction management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/) for traffic coordination and demolition, as well as [urban design](https://pelenoir.com/en/tenders-of-europe/disciplines/urban-design-and-planning/) and planning to ensure integration with existing transport infrastructure.

## How to take part

### Who can apply

- Bidders must submit references for project managers and technical staff.
- Consortia limited to a maximum of 2 members.

### What to submit

- D.6_Bietererklärung (bidder declaration)
- D.1_Allgemeine_Ausschreibungsbestimmungen (general tender conditions)
- D.2_Projektbeschreibung (project description)
- LV_D.1-D.6_OeBB_Unterfuehrung_K14_S1b (bill of quantities)
- Kalkulation_Verrechnungsstundensatz_Dienstleistungen_Muster (calculation template for hourly rates)
- Deckblatt Angebot_DL_OV_OeBB-Unterfuehrung (offer cover sheet)
- D.5.1_K1_Planung-Kunstbauten-Kalkulation (planning and calculation for structural works)
- D.4_Allgemeine_Vertragsbestimmungen (general contract conditions)
- Pläne.zip (plans and drawings)

### Award criteria

- Quality of submitted references for project managers and technical staff (max 100 points each)
- Education and professional experience of project managers and technical staff (max 100 points each)
- Gender parity (max 100 points)

## Tender documents

The visible document package includes tender and contract-related PDFs such as general tender conditions (D.1), project description (D.2), bill of quantities (LV_D.1-D.6), bidder declaration (D.6), and general contract conditions (D.4). It also contains a calculation template for hourly rates in XLSX format and a large ZIP file labeled 'Pläne.zip,' which likely contains detailed plans and drawings for the bridge replacement project. The package appears to support the submission process, including forms and templates for bids. However, the exact contents of the ZIP file cannot be confirmed without access, and some file sizes are not explicitly declared.

## Disciplines

- **Engineering** (primary, 70%): Structural engineering, bridge design, and technical planning for the replacement of two railway overpasses, including load calculations, material specifications, and compliance with ÖBB safety and operational requirements.
- **Project and construction management** (secondary, 20%): Traffic management planning during construction, coordination of demolition and replacement phases, and oversight of execution planning to ensure minimal disruption to highway and railway operations.
- **Urban design and planning** (secondary, 10%): Integration of the new overpasses into the existing transport infrastructure, including spatial planning for traffic flows and alignment with regional transport strategies.

## Related projects

- [Transformer fire suppression systems: on-site mechanical and electrical supervision nationwide](https://pelenoir.com/en/tenders-of-europe/projects/transformer-fire-suppression-systems-on-site-mechanical-and-20062/) — Austria · Service contract · deadline 2026-12-10 (11 days left to apply)
- [Hochwasserschutz Ill km 11.6 to 20.5 Execution Planning](https://pelenoir.com/en/tenders-of-europe/projects/hochwasserschutz-ill-km-11-6-to-20-5-execution-planning-19015/) — Feldkirch, Austria · Service contract · deadline 2026-12-11 (12 days left to apply)
- [Geotechnical consulting for Vienna tram track construction](https://pelenoir.com/en/tenders-of-europe/projects/geotechnical-consulting-for-vienna-tram-track-construction-19143/) — Vienna, Austria · Service contract · deadline 2026-11-27 (closed 2 days ago)
- [Motorway tunnel water hardness stabilisation: hydrogeochemical surveys for drainage upgrades](https://pelenoir.com/en/tenders-of-europe/projects/motorway-tunnel-water-hardness-stabilisation-hydrogeochemical-surveys-19705/) — Gratkorn, Austria · Service contract · deadline 2027-01-13 (45 days left to apply)
- [ASFINAG Bridge Inspections 2027 – Part 01](https://pelenoir.com/en/tenders-of-europe/projects/asfinag-bridge-inspections-2027-part-01-18048/) — Austria · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Bridge condition surveys: structural inspections for 11 motorway lots in Austria](https://pelenoir.com/en/tenders-of-europe/projects/bridge-condition-surveys-structural-inspections-for-11-motorway-lots-19701/) — Austria · Service contract · deadline 2026-11-30 (closes tomorrow)

## Source

Original notice on Austrian Public Procurement Search: https://ausschreibungen.usp.gv.at/at.gv.bmdw.eproc-p/public/notice-detail?object=41a809d9-0b61-4991-86b8-74dc07973af3-b1faa57a-d14a-43bb-851c-cf424d3b5432  
Original title: A12 ERB K14 & S1b ÖBB-Überführung - Planungsleistungen

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/replacement-of-two-obb-overpasses-on-a12-inntal-autobahn-14614/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
