---
title: "Renovation of AaltoAlvar Aquatic Center Phase 4 (LVIA design)"
url: "https://pelenoir.com/en/tenders-of-europe/projects/renovation-of-aaltoalvar-aquatic-center-phase-4-lvia-design-18745/"
id: 18745
country: "Finland"
city: "Jyväskylä"
region: "Central Finland"
client: "the contracting authority's contact"
type: "Service contract"
procedure: "open procedure"
deadline: "2026-12-13"
status: "open"
days_left: 14
status_as_of: "2026-11-29"
value: "EUR 400 000"
disciplines: ["Architecture","Engineering","Sustainability","Project and construction management"]
source: "HILMA"
source_url: "https://www.hankintailmoitukset.fi/en/public/procedure/39963/enotice/61642/"
updated: "2026-11-11"
publisher: "Pelenoir – Tenders of Europe"
---

# Renovation of AaltoAlvar Aquatic Center Phase 4 (LVIA design)

> Renovating a heritage swimming hall means modernizing pools and saunas while preserving Alvar Aalto’s original design.

**Status (2026-11-29):** 14 days left to apply — deadline 2026-12-13 13:00  
**Location:** Jyväskylä, Central Finland, Finland  
**Contracting authority:** the contracting authority's contact  
**Opportunity type:** Service contract — open procedure  
**Declared value:** EUR 400 000  
**CPV:** 71320000 Engineering design services  

## About the project

Comprehensive renovation of the historic AaltoAlvar Aquatic Center, focusing on the 1955 swimming hall section and related facilities. The project includes structural repairs, technical systems upgrades, and modernization of pools, changing rooms, saunas, and water treatment areas while preserving the building's cultural heritage and UNESCO-protected features.

## Why it matters

Renovating a heritage swimming hall requires modernizing pools and saunas while preserving Alvar Aalto’s original design.

> Jyväskylä’s tender for the renovation of the AaltoAlvar Aquatic Center Phase 4 includes structural repairs, technical systems upgrades, and heritage preservation consulting for the 1955 swimming hall section.

This requirement reveals how heritage renovation briefs are turning into a quiet test of a team’s ability to modernize pools and saunas while respecting Alvar Aalto’s original design.

## Scope of work

Design services for the renovation of AaltoAlvar Aquatic Center Phase 4, including project planning (hankesuunnittelu), general and implementation design, cost estimation, construction-phase design, and warranty-period tasks. The design must respect the building's UNESCO-protected heritage and ensure minimal disruption to operations during construction.

### Deliverables

- project plans and reports for decision-making
- coordinated design solutions across disciplines
- cost estimates and phasing proposals
- general and implementation design documents
- construction-phase design support
- commissioning and warranty-period design tasks

### Required services

- building design (LVIA)
- [structural engineering](https://pelenoir.com/en/tenders-of-europe/disciplines/engineering/)
- HVAC and technical systems design
- water treatment system design
- heritage preservation consulting
- cost estimation and phasing planning

## Pelenoir assessment

This project primarily involves the architectural renovation of a historic aquatic center, with a strong focus on preserving UNESCO-protected heritage features while modernizing the facility. The scope explicitly supports multiple AEC disciplines, including [architectural design](https://pelenoir.com/en/tenders-of-europe/disciplines/architecture/), structural and technical engineering, [sustainability](https://pelenoir.com/en/tenders-of-europe/disciplines/sustainability/) consulting, and [project management](https://pelenoir.com/en/tenders-of-europe/disciplines/project-and-construction-management/). The architectural and heritage aspects dominate, but engineering and technical planning are critical for ensuring the building's safety and functionality. Project and construction management tasks ensure coordinated delivery and minimal operational disruption.

## How to take part

### Who can apply

- compliance with Finnish public procurement law (32014L0024)
- submission of European Single Procurement Document (ESPD)
- meeting minimum suitability and qualification requirements for tenderers and key personnel

### What to submit

- tender submission in Finnish
- compliance with tender documents and appendices
- electronic submission via specified platform

### Award criteria

- most economically advantageous tender based on price and quality criteria specified in the tender documents

## Disciplines

- **Architecture** (primary, 40%): Architectural design for the renovation of the historic AaltoAlvar Aquatic Center, including preservation of UNESCO-protected heritage features, modernization of the swimming hall, and integration of new functional requirements while respecting the building's original design intent.
- **Engineering** (secondary, 30%): Structural engineering, HVAC and technical systems design, and water treatment system upgrades to ensure the building's safety, functionality, and compliance with modern standards during the renovation.
- **Sustainability** (secondary, 15%): Sustainability consulting and building performance optimization to ensure energy efficiency, minimal operational disruption, and compliance with modern environmental standards while preserving heritage features.
- **Project and construction management** (secondary, 15%): Project planning, cost estimation, phasing proposals, and construction-phase design support to ensure the renovation is delivered on time, within budget, and with minimal disruption to ongoing operations.

## Related projects

- [OSAO Construction Design Services Framework](https://pelenoir.com/en/tenders-of-europe/projects/osao-construction-design-services-framework-16061/) — Oulu, Finland · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Pakasmaa Building Renovation Design](https://pelenoir.com/en/tenders-of-europe/projects/pakasmaa-building-renovation-design-17015/) — Muonio, Finland · Service contract · deadline 2026-11-30 (closes tomorrow)
- [Ilomantsi School Project Design and BIM Coordination](https://pelenoir.com/en/tenders-of-europe/projects/ilomantsi-school-project-design-and-bim-coordination-18741/) — Ilomantsi, Finland · Service contract · deadline 2026-12-11 (12 days left to apply)
- [AaltoAlvari Swimming Center Phase 4 Renovation](https://pelenoir.com/en/tenders-of-europe/projects/aaltoalvari-swimming-center-phase-4-renovation-18747/) — Jyväskylä, Finland · Service contract · deadline 2026-12-13 (14 days left to apply)
- [Unioninkatu 38 renovation design](https://pelenoir.com/en/tenders-of-europe/projects/unioninkatu-38-renovation-design-18749/) — Helsinki, Finland · Service contract · deadline 2026-12-14 (15 days left to apply)
- [Ruovesi Comprehensive School Space Programme Development](https://pelenoir.com/en/tenders-of-europe/projects/ruovesi-comprehensive-school-space-programme-development-18740/) — Ruovesi, Finland · Service contract · deadline 2026-12-01 (2 days left to apply)

## Source

Original notice on HILMA: https://www.hankintailmoitukset.fi/en/public/procedure/39963/enotice/61642/  
Original title: Vesiliikuntakeskus AaltoAlvarin peruskorjauksen vaihe 4, LVIA-suunnittelu

Summary and assessment prepared by Pelenoir from the public notice. The original notice is binding.

---
HTML version: https://pelenoir.com/en/tenders-of-europe/projects/renovation-of-aaltoalvar-aquatic-center-phase-4-lvia-design-18745/  
All projects as JSON: https://pelenoir.com/en/tenders-of-europe/projects.json
